1 / 9

6 x 5 Rectangular Spiral (150 km grid spacing)

6 x 5 Rectangular Spiral (150 km grid spacing). IP. 4350 km total (2248 nmi). Approximate Duration: GIV - 5.5 hr DC8 - 5.5 hr GH - 6.7 hr. FP. 5 x 5 Square Spiral (150 km grid spacing). IP. 3600 km total (1944 nmi). Approximate Duration: GIV - 4.5 hr DC8 - 4.5 hr GH - 5.6 hr.

zilya
Download Presentation

6 x 5 Rectangular Spiral (150 km grid spacing)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6 x 5 Rectangular Spiral (150 km grid spacing) IP 4350 km total (2248 nmi) Approximate Duration: GIV - 5.5 hr DC8 - 5.5 hr GH - 6.7 hr FP

  2. 5 x 5 Square Spiral (150 km grid spacing) IP 3600 km total (1944 nmi) Approximate Duration: GIV - 4.5 hr DC8 - 4.5 hr GH - 5.6 hr FP

  3. 6 x 5 Lawnmower (150 km grid spacing) IP 4350 km total (2348 nmi) Approximate Duration: GIV - 5.3 hr DC8 - 5.3 hr GH - 6.5 hr FP

  4. 2 2 2 Rotating Figure 4 (300 km radius legs) 3 300 km FP 6 3500 km total (2175 nmi) 150 km eye wall IP 2 Approximate Duration: DC8 - 5 hr GH - 6.2 hr 5 7 4

  5. 2 2 2 Butterfly (450 km radius legs) FP 450 km 3 3600 km total (1944 nmi) 225 km eye wall IP 2 2 Approximate Duration: DC8 - 4.5 hr GH - 5.6 hr 5 4

  6. 2 2 2 Star Pattern (end points at 500 km radius) 500 km 8 5 3600 km total (1944 nmi) 6 7 4 75 km eye wall 3 9 Approximate Duration: GIV - 4.5 hr DC8 - 4.5 hr GH - 5.6 hr 10 2 12 13 IP 11 FP

  7. 2 2 2 Single Figure 4 (500 km radius legs) 3 500 km 2700 km total (1458 nmi) 225 km eye wall IP 2 2 Approximate Duration: DC8 - 3.5 hr GH - 4.2 hr FP

  8. Operating regions for G-V (blue) DC-8 (yellow) and NOAA P-3 (red) with other colors indicating overlap regions. The optimum location for genesis missions with the G-V and DC-8 working the same system is west of the black line in the west Atlantic or central Caribbean. To work a system well east of the black line, the DC-8 would need a suitcase deployment. (The next version of this map should include operating areas for the WB-57 within 2-h ferry from Ellington or KSC. Note that deployment to Bermuda is not planned for the P-3s, so areas north and east of Bermuda should not be considered.) Issue: DC-8 circle is 2.5h ferry; G-V circle is ~3h ferry. Realistic for basic patterns? Implications for high priority targeting?

  9. Atlantic Flight Ranges and Duration (3-hr ferry-too long for many purposes) Comment: GH on-station times of >12 hours are preferred, because there would then likely be time for at least 2 different flight patterns, or time to execute a single flight pattern more than once, or to undertake additional shorter modules.