MT Continuum Status. Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team. 15-17 Feb 11. Overview. MT Continuum overview Application to other communities Project status. MT Continuum Prototype Project.
E N D
MT Continuum Status Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team 15-17 Feb 11
Overview • MT Continuum overview • Application to other communities • Project status
MT Continuum Prototype Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE-conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: SSP / contractors - Requirements Owners NAWCTSD / AIM team - CPM/LO Module support LSI, Inc. - ISD and self-paced content design/development
Application to Other Communities • Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development • Closely coordinated with NAVEDTRA 136 development • NETC N7 staff recommended as “Poster Child” for ongoing NETC Continuum effort with all Centers • Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content
Project Status • Plan, Analyze and Design Completed • JDTA • Establishment of initial 3 major projects • Approval of revised 11-project structure • Approval of learning objectives • Approval of ISD considerations elements • Production Phase Kickoff Pending • Will be followed by export of 11 projects from CPM to LO Module for production development in AIM I Rel 4.1 on fedsun
AIM Tool Usage • Dedicated MT Continuum Prototype CPM and AIM I Rel 4.1 instances hosted in Orlando • Local AIM I Rel 4.1 instances running at GD-AIS Pittsfield (SMEs) and at LSI Jax (ISD/CD) • Bi-directional data exchange between LO Module and LSI Venus.net LDC authoring toolset in place • Excellent feedback from MT Continuum team on enhanced functionality and performance needed in CPM & LO Module
AIM Tool Usage(contd) • Status: • Per GD-AIS feedback, performance-enhanced version of AIM I Rel 4.1 running locally in Pittsfield and Jax as well as on Orlando server • Per GD-AIS feedback, significant enhancements made to AIM I Rel 4.1 storyboard functions/output • Several additional enhancements recommended by GD-AIS incorporated into AIM I Rel 4.1 (Jan 11 delivery) • AIM team resolved performance and reliability issues with Orlando fedsun Metaframe instance
Issues/Concerns • “End to end” surveillance/maintenance test on TLO/ELO in process to: • confirm existing change impact identification functionality in CPM and LO Module • identify near-term updates • refine longer-term enhancements • Testing begun by Mark Campbell and Mike Lueken (LMMS) w/ favorable results • Identified critical issues addressed as part of AIM I Rel 4.1 and 5.0 • Further testing surveillance testing on LDC is still required and ongoing with Rel 4.1 by Jamie Swaim (CSF) • Team continues to refine versioning business rules/process
Modernized AIM Modernized AIM can tie the entire process together
FRM Inputs on Enhancements • Item 4.2.4.37: Add support to update Section content using the No-Change Change capability like AIM I. • Item 4.2.4.38: Add ‘Select Later IETM’ functionality in the LO Module to update your Section’s IETM links with a later version of an IETM without having to reselect nodes