THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW ESA

THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW ESA Dr. Chuck Carlson University of California - Berkeley. Outline. Summary of ESA Status at FM2/3 PSR and FM4/5 PER Final Test and Cal Results vs. Requirement Fulfillment PFRs Open Items. ESA Status.

beau
Download Presentation

THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW ESA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS INSTRUMENT SUITE • FM2/FM3 PRE-SHIP REVIEW • FM4/FM5 PRE-ENVIRONMENTAL REVIEW • ESA • Dr. Chuck Carlson • University of California - Berkeley

  2. Outline • Summary of ESA Status at FM2/3 PSR and FM4/5 PER • Final Test and Cal Results vs. Requirement Fulfillment • PFRs • Open Items

  3. ESA Status • Requirements and Design: • No major changes to Requirements or Design since M-CDR • No RFAs from previous reviews outstanding • Procurement: • All procurement is complete. • Assembly and Test: • 5 ESA mechanical assemblies complete • 6 sets of High Voltage power supplies complete and tested • 6 HV mother boards assembled and tested with HV supplies • 12 anodes (6 sets) assembled and tested with MCPs • 5 Preamp boards complete; 3 tested in complete units • 5 HV Interface boards complete; 3 tested in complete units • FM1-FM5 assembled • FM1-FM2 calibrated • 6 LVPS built and tested

  4. ESA Requirements • ESA Mission Requirements Fulfillment: • MRD fulfillment noted in THEMIS Verification Matrix (see MSE Presentation) • Integrated ESA and component parts compliant with mission requirements

  5. Results of FM2 ESA Calibration • Energy/Angle response confirmed • MCP Gain characteristics tested and successful • MCP Noise – working on fixing low level noise issue • Anode response tested and confirmed • End-to-end performance has been verified

  6. PFR Status • ESA PFR List: • All ESA PFRs have been Closed except PFR 071 (spare) and PFR 106 • PFR 106 – currently testing modified grounding scheme to eliminate noise pick-up

  7. Open Items • ESA Calibration check still to be done • ESA calibration confirmation after Environmental Testing

  8. ESA Back-Up

  9. Back-up: EIDP Electrical • THEMIS ESA (BINDER #25): • Includes THEMIS Coat and Stake Log, Mixing Records, Assembly Instructions, Schematics, Board Layouts, Repair/Rework Instructions, Inspection Reports, Bill of Materials and Magnetics Test Procedures (LVPS and HVPS only) for: • Mother Board • Sweep I/F Board • Pre-Amp Board • HVPS and HVNS Boards • LVPS Board (assembled and tested at SWRI) • Anodes THAN and TLAN

  10. Back-up: EIDP Mechanical • THEMIS ESA (BINDER #26): • List of Mechanical Assembly Procedures • Assembly Records • Assembly Report Sheet • Vibration Test Procedure and Report • Mechanical Drawing Tree • Master As-Built Mechanical Drawings