An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plano Decenal 2011-2020 Diretoria de Planejamento e Expansão Departamento de Estudos da Expansão do Sistema Outubro/2010

  2. Piauí (Rede Básica) LEGENDA Sobral CE SE 500 kV (Exist./Futura) SE 230 kV (Exist./Futura) Coelho Neto 2011 Piripiri SE 138 kV (Exist./Futura) SE 69 kV (Exist./Futura) Peritoró MA SE 34,5 kV (Exist./Futura) Teresina III 2014 Teresina I SE 13,8 kV (Exist./Futura) Área a ser estudada após 2020 P. Dutra MA UTE/PCH/CGE (Exist./Futura) Teresina II SE Part. 69 kV (Exist./Futura) SE Part. 34,5 kV (Exist./Futura) SE Part. 13,8 kV (Exist./Futura) P. Dutra MA LT 500 kV (Existente) 545kmaproximadamente LT 230 kV (Existente) Boa Esperança LT 138 kV (Existente) Picos LT 69 kV (Existente) Colinas MA LT 34,5 kV (Existente) Ribeiro Gonçalves 2011 LT 13,8 kV (Existente) Elizeu Martins LT 500 kV (Futura) LT 230 kV (Futura) São João do Piauí LT 138 kV (Futura) 960kmaproximadamente LT 69 kV (Futura) Sobradinho BA LT 34,5 kV (Futura) LT 13,8 kV (Futura) Área de potencial econômico

  3. CGE PEDRA DO SAL Regional Piripiri (Situação Atual) 25,8MW PARNAÍBA 2,4MW CAMURUPIM 23,3MW TABULEIROS LEGENDA SE 500 kV (Exist./Futura) 4,8MW 141km (123km em CABO 477 CAA e 18km em 559,5 CAL) SE 230 kV (Exist./Futura) LUZILÂNDIA 37km em 1/0 CAA SE 138 kV (Exist./Futura) Tensões < 0,8pu (55kV) SE 69 kV (Exist./Futura) SOBRAL - CE 4,6MW MATIAS OLÍMPIO SE 34,5 kV (Exist./Futura) SE 13,8 kV (Exist./Futura) ESPERANTINA PIRACURUCA 5,8MW UTE/PCH/CGE (Exist./Futura) 42km em 2/0 CAA SE Part. 69 kV (Exist./Futura) Tensão Fornecida em todos os patamares de carga: 144kV SE Part. 34,5 kV (Exist./Futura) BARRAS PIRIPIRI (CHESF) SE Part. 13,8 kV (Exist./Futura) 73km em CABO 2/0 CAA LT 500 kV (Existente) PEDRO II CABECEIRAS LT 230 kV (Existente) SÃO JOAQUIM 70km em 2/0 CAA LT 138 kV (Existente) CAMPO MAIOR LT 69 kV (Existente) BEM BOM LT 34,5 kV (Existente) UTE ENGUIA LAGOINHA LT 13,8 kV (Existente) Tensões < 0,9pu (31kV) SIGEFREDO TERESINA I LT 500 kV (Futura) S. JOÃO DA SERRA LT 230 kV (Futura) LT 138 kV (Futura) CASTELO 170km em CABO 2/0 CAA LT 69 kV (Futura) LOCALIZAÇÃO S. MIGUEL DO TAPUIO LT 34,5 kV (Futura) LT 13,8 kV (Futura) COQUEIRO

  4. CGE PEDRA DO SAL Regional Piripiri (Necessidade até 2020) PARNAÍBA II PARNAÍBA CAMURUPIM SE 69/13,8kV 12,5MVA (2012) ECF 2784/2009 TABULEIROS SE 69/13,8kV 2x25MVA 12km em 559 (2012) ECF 2784/2009 BURITI DOS LOPES 15km em 556 CAA (2014 ECF 2784/2009 e 2016) LEGENDA SE 500 kV (Exist./Futura) LUZILÂNDIA 68km em 477 CAA (2013) SE 230 kV (Exist./Futura) 141km em CABO 652 CAL (2011) ECF 2668/2010 SE 138 kV (Exist./Futura) SE 69 kV (Exist./Futura) MATIAS OLÍMPIO SE 34,5 kV (Exist./Futura) SOBRAL - CE 85km em 477 CAA (2012) ESPERANTINA SE 13,8 kV (Exist./Futura) PIRACURUCA UTE/PCH/CGE (Exist./Futura) 73km em 477 CAA (2012) SE Part. 69 kV (Exist./Futura) BARRAS PIRIPIRI (CHESF) MIGUEL ALVES SE Part. 34,5 kV (Exist./Futura) SE Part. 13,8 kV (Exist./Futura) PEDRO II CABECEIRAS LT 500 kV (Existente) 70km em 477 CAA (2014) SÃO JOAQUIM LT 230 kV (Existente) SE 69/34,5kV 12,5MVA 67km em 477 CAA (2011) ECF 2784/2009 LT 138 kV (Existente) CAMPO MAIOR LT 69 kV (Existente) UTE ENGUIA LT 34,5 kV (Existente) LAGOINHA SIGEFREDO BEM BOM LT 13,8 kV (Existente) TERESINA I (LPT) em cabo 4/0 CARACTERÍSTICAS DA REGIONAL -Longas linhas em 69kV (152km); -Longas linhas em 34,5kV (170km); -Cabos de pouca capacidade; -Maiores demanda na ponta do sistema LT 500 kV (Futura) SE 69/34,5kV 12,5MVA 98km em 477 CAA (2012) S. JOÃO DA SERRA LT 230 kV (Futura) CASTELO LT 138 kV (Futura) LOCALIZAÇÃO LT 69 kV (Futura) S. MIGUEL DO TAPUIO LT 34,5 kV (Futura) LT 13,8 kV (Futura) COQUEIRO -Maiores perdas técnicas; -Queda de tensão fornecida em 69kV e 34,5kV; -Pouca confiabilidade do sistema

  5. PIAUÍ - PARTICIPAÇÃO DO MERCADO POR PONTO DE ENTREGA 2008 2015

  6. PIRIPIRI- PROJEÇÃO DA CARGA DE DEMANDA (MW)

  7. PIRIPIRI - PARTICIPAÇÃO DO MERCADO POR PONTO DE ENTREGA 2008 2015

  8. Obrigado! Diretoria de Planejamento e Expansão Contatos luizcarlos@cepisa.com.br nonatomoura@cepisa.com.br thiago.maciel@cepisa.com.br Av. Maranhão, 759, Centro-Sul Teresina-PI (86)3228-8270 / (86)3228-8204 / (86)3228-8240