Richland Operations Status Report Robert B. Elkins

Richland Operations Status Report Robert B. Elkins. ASP-DOECAP 2010 Workshop September 2010 Seattle, Washington. History of the Hanford Site. Site established in 1942 as part of the Manhattan Project to produce plutonium

chandler
Download Presentation

Richland Operations Status Report Robert B. Elkins

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Richland Operations Status ReportRobert B. Elkins ASP-DOECAP 2010 Workshop September 2010 Seattle, Washington

  2. History of the Hanford Site • Site established in 1942 as part of the Manhattan Project to produce plutonium • Nine reactors and five chemical separations facilities built and operated • Defense mission ended in the late 1980s • Environmental cleanup mission subsequently established through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement - TPA) • Department of Energy • Environmental Protection Agency Region X • Washington State Department of Ecology

  3. Current Mission: Hanford Organization DOE - Richland Operations Office Mission Support Contract (Mission Support Alliance, LLC) Plateau Remediation Contract (CH2M Hill Plateau Remediation Company) River Corridor Closure Contract (Washington Closure Hanford) DOE - Office of River Protection Tank Farms Contract (Washington River Protection Solutions) Waste Treatment Plant (Bechtel National, Inc.) DOE - Pacific Northwest Site Office Pacific Northwest National Laboratory (Battelle)

  4. Current Mission: Shrinking the Footprint • Footprint reduction of 45-60% by 2011 (Total reduction of 80-90% by 2015 leaving only the Central Plateau Inner Zone) • Work in four areas: • River Corridor (~210 sq. miles) • Central Plateau, Outer Zone(~65 sq. miles) • Central Plateau, Inner Zone(~10 sq. miles) • Hanford Reach National Monument (~300 sq. miles, including Arid Lands Ecology Reserve)

  5. Current Activities • Central Plateau Cleanup • Solid Waste (LLW, MLLW, TRU, RH and CH) • Liquid Effluents • CERCLA waste sites (burial grounds, cribs) • Decommissioning and demolition of facilities • River Corridor Cleanup • Waste Site Remediation • Reactor decommissioning and entombing • Groundwater Program • Protecting the Columbia River • Treatment • Monitoring/Modeling

  6. Recovery Act Funding • DOE’s Office of River Protection and Richland Operations Office American Recovery and Reinvestment Act (ARRA) apportionment totals $1.961 billion • Must be used by September 2011 • Lives touched – 4,547. Includes jobs saved plus new hires. (CHPRC March 2010) • Outside Contracts – over $500M awarded

  7. Hanford Stimulus Funded Work Facility Demolition

  8. Hanford Stimulus Funded Work • Removal of gloveboxes from the Plutonium Finishing Plant • 327 Hot Cell Removal

  9. Hanford Stimulus Funded Work • 135,000 tons of contaminated soil removed from the BC Control Area • Equipment relocation from the U Canyon deck into the cells • Retrieval of TRU waste from underground storage

  10. Hanford Stimulus Funded Work • Bureau of Reclamation ¼ Corner Section Marker - 1939 • Debris removal from Arid Lands Ecology Reserve

  11. What’s Ahead • Planned completion of River Corridor by 2015 • Planned completion of the Outer Zone by 2015 • Site closure date extending beyond 2050

  12. Projected use of Laboratories and TSDFs in FY 11 and FY 12 • Continue use of DOECAP contracted laboratories • Represents about 20% of the site’s analytical workload • $1.3 million spent in FY 2010 • Subcontract laboratory usage is expected to remain the same for FY’s 2011 and 2012

  13. RL Laboratories* On-Site Laboratories • WSCF (MSC) • Plutonium Finishing Plant for NDA only (PRC) • 222-S Advanced Technologies and Laboratories (ATL) Off-Site Laboratories • Test America Laboratory – Richland, Washington • Test America Laboratory – St. Louis, Missouri • Test America Laboratory – Knoxville, Tennessee • Eberline Laboratory – Richmond, California • Lionville Laboratory – Lionville, Pennsylvania • PNNL has three small dollar-value contracts with other DOECAP laboratories * Does not include Industrial Hygiene Laboratories

  14. What’s Ahead for the TSDFs • Stimulus funding to accelerate treatment and disposal of remaining legacy M/LLW backlog • Stimulus funding to accelerate retrieval of remaining CH TRU wastes • DOECAP TSDF Contracts • Perma-Fix Northwest , Richland, WA: MLLW Treatment and LLW volume reduction • Perma-Fix M&EC, Oak Ridge Site, TN: MLLW Treatment • Perma-Fix DSSI, Kingston, TN: MLLW Treatment • Perma-Fix Gainesville, FL: MLLW Treatment & waste bulking • ES-Clive, UT: MLLW Treatment & disposal

  15. Hanford Participation in DOECAP • Continue to audit laboratories used by DOE’s Richland Operations (RL) • Continue to support revisions and changes to QSAS