An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bond Construction UpdateCitizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE ENGAGE EMPOWER

  2. Agenda • Completed Construction Projects • PCC Learning Resource Center • Current & Upcoming Construction Projects • LAC Central Plant • LAC South Quad Complex • LAC Learning Resource Center • LAC Building A, Student Services Retrofit • LAC Math Technology Building • LAC Parking Structure • LAC Infrastructure Improvements – Phase 3 • PCC Central Plant • PCC Industrial Tech Phase 1 • PCC MDAB (Multi-Disciplinary Academic Building) • PCC Building C Retrofit • District Wide Building Needs Assessment Projects • Toilet Improvement Projects • Quick-Start Projects • ADA Projects • Lighting Projects • Classroom Improvement Projects • Q & A

  3. Completed Construction Projects PCC Learning Resource Center – Measure E 2002 • Construction Complete • Modern Facility with Computer Lab and Multimedia • Stand alone Data Center. Provides District IT redundancy • Bridge to building E • Design elements move towards energy efficiencies • Ribbon cutting held 9/17/08

  4. Current and UpcomingConstruction Projects LAC Central Plant – Measure E 2002 • Central Plant equipment, Public Safety, & Field House for Athletics • Final FF&E installation underway • Plant ready for operation and awaiting completion of LRC & SQC • Construction 99% Complete • Anticipated startup 11/08

  5. Current and UpcomingConstruction Projects Construction approx. 86% Complete Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room Substantial completion anticipated December 2008 South Quad Complex – Measure E 2002

  6. Current and UpcomingConstruction Projects Construction 89% Complete Adds 10,000 ASF to existing building Substantial Completion Anticipated December 2008 LAC/Learning Resource Center – Measure E 2002

  7. Current and UpcomingConstruction Projects Design Development to be submitted this month Adds 4,000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc. LAC Building A – Student Services Retrofit Measure E 2008

  8. Current and UpcomingConstruction Projects Completed Schematic Design (June 2008) Currently in Design Development phase Will house Math and Culinary Arts instructional program as well as Reprographics Estimated start of construction 2011 LAC Math Technology Building – Measure E 2008

  9. Current and UpcomingConstruction Projects LAC Parking Structure – Measure E 2008 • Planning initiated for approximately 900 Vehicles • To be procured under “Design Build Delivery” method • To be located Southeast corner of Lot J adjacent to the Verizon building • Photovoltaic Electrical Generation Array on top level of structure • Anticipated start of construction 2009

  10. Current and UpcomingConstruction Projects LAC Infrastructure Improvements – Phase 3 Measure E 2008 • Planning underway with P2S Engineering • Completes chilled water lines to North side of campus • Includes other major utility upgrades; RW,DW, Data, etc. • Existing building HVAC systems to be upgraded in synch with infrastructure improvements • Coordinated with modernization and quick start projects

  11. Current and UpcomingConstruction Projects Houses Central Plant equipment and Maintenance and Operations facility Construction Approximately 99% Complete Currently provides chilled water to the PCC LRC PCC Central Plant – Measure E 2002

  12. Current and UpcomingConstruction Projects PCC Industrial Technology Center Phase 1 Measure E 2002 • Modern facility houses Machine Tool and Welding Departments • Construction is 42% complete • Replaces existing antiquated structures • New Northern face of the campus • Completion anticipated summer 2009

  13. Current and UpcomingConstruction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2002 • 50% construction documents submitted • Swing space planning completed 9/2008, construction Spring 2009 • Anticipated start of MDAB construction Summer 2009 • To be completed in two phases

  14. Current and UpcomingConstruction Projects PCC Building C Retrofit - Measure E 2008 • To be designed by Hill Partnership Architects • Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices • Swing space to be located in PCC building V • Anticipated start of construction Summer 2009 • To be completed concurrently with MDAB project

  15. Current and UpcomingConstruction Projects District Wide Building Needs Assessment Project Measure E 2008 • Toilet Improvement Projects • Quick-Start Projects • ADA Projects

  16. Current and UpcomingConstruction Projects District Wide Building Needs Assessment Projects Measure E 2008 • Lighting Projects • Classroom Improvement Projects

  17. QUESTIONS & ANSWERS EDUCATE ENGAGE EMPOWER