1 / 5

All Experimenters’ Meeting

February 4, 2013. All Experimenters’ Meeting. Shutdown 2012. Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning has begun TeV & Muon Rings – Partially available for tours with approval and appropriate training.

dard
Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. February 4, 2013 All Experimenters’ Meeting

  2. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning has begun TeV & Muon Rings – Partially available for tours with approval and appropriate training

  3. Power Outages - Unplanned • Feeder 46B • Tuesday, January 29th • Isolated fault (Between F4 & P71) • Repairs pending manhole access • Feeder 36 • Wednesday, January 30th • Isolated fault • Believe it was a splice • Manhole access on Friday to investigate

  4. Power Outages – MSS Bypass Project • NS7 Oil Switch • Monday, January 7th for ~ 2 weeks • 0800-1000 power off to connect the generator • Impacts – NS7 Service Building and Adjacent Enclosures (NM2, NM3) • PS1 Oil Switch (moved earlier than original) • January 28thfor ~ 2 weeks (In progress) • Will be running house power off a generator • Impacts – PS1 Service Buildings and Adjacent Enclosure (P01) & Target Service Building (TSB) • NS1 Oil Switch • February 11thfor ~ 2 weeks • Will be running house power off a generator, negotiating requirements • Impacts – NS1 Service Building and Adjacent Enclosures (N01, NM1) • MS1 & MS2 • March 11thfor ~ 2 weeks • Will be running house power off a generator • Impacts – MS1 & MS2 Service Buildings and Adjacent Enclosures (M01, M02, & M03)

  5. Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - http://www-ad.fnal.gov/ops/schedule.html ANU - http://www-cons/ Proton Source -http://www-ad.fnal.gov/proton/protonsched/shutdown2012.html

More Related