An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters MeetingPIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013

  2. PIP Report F.G. Garcia AEM - PIP Report 11/04/2013

  3. Linac200 MHz RF Power System • Modulator Upgrade • 35kV, Marx-topology modulator to drive • AD/EE complete testing with 3 cells • Full capability (900V - 100 A) • AD/EE Working on building 9 cells Marx Modulator • Cells will be mounted on their back with a striplinemaking the electrical path between cells • SLAC • Design based on ILC Modulator • Develop a learning control system triode (or SBK) output voltage (3 cells) output current output voltage (1 cell) Two cells on the final configuration as an example F.G. Garcia AEM - PIP Report 11/04/2013

  4. Linac200 MHz RF Power System • MBK201 FERMI • Complication during contract negotiations • Re-evaluation of the technical design • SBK201FERMI • 5MW pulsed klystron to operate at 200 MHz for use as a power source for the DTL Linac • Bid closed 11/1/2013 • Single bidder -> CPI • Activities • Initiate gallery floor plan layout in collaboration with AD/MSD Drafter Dept. preliminary F.G. Garcia AEM - PIP Report 11/04/2013

  5. BoosterRF system • New cavities • Efforts continue on developing a model of the existing Booster cavity • Full 3D model with most of the details incorporated • 3D EM simulations • Identified weak points of max electric field in air and vacuum • A modified/improved design has been under development • PIP plan is to build 3 more cavities • New ferrite cores • Procurement of new ferrite cores underway • High-mu ferrite proved to be a complicate process • Working with vendor to get the recipe at acceptable performance F.G. Garcia AEM - PIP Report 11/04/2013

  6. BoosterRF system • Cavities Refurbishment • 9of 19 cavities have been refurbished Stats: Last refurbishment :7. 4*wks <refurb.>last 3 cav. : 9.0 wks * Cones and tuners were available BRF 1,3,5,6,7,8,11,15,17 Booster Cavity Work Refurbished (15Hz) Cavity Removed Courtesy: K. Gollwitzer F.G. Garcia AEM - PIP Report 11/04/2013