1 / 6

Modular Coil Half Period Assembly

Modular Coil Half Period Assembly. One Possibility. RY = 14 °. Total Weight 18,479 lbs (assumes steel construction). RX = 20 °. RZ = 25 °. DZ = 30”. DX = 20”. Z. Y. X. DY = 66”. Isometric view with coil half period attached. Front View. Side View.

denna
Download Presentation

Modular Coil Half Period Assembly

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modular Coil Half Period Assembly One Possibility

  2. RY = 14° Total Weight 18,479 lbs (assumes steel construction) RX = 20° RZ = 25° DZ = 30” DX = 20” Z Y X DY = 66”

  3. Isometric view with coil half period attached

  4. Front View Side View

  5. 20 ton Hilman roller with curvature Nook – Actionjac (each 10 ton, 30” stroke) Lubrite bearing plate Simple block designed guide roller system. Turnomat ball plates (see next page)

  6. TURNOMAT Linear Bushing Assemblies. (Hilman rollers also could be used for this application)

More Related