1 / 8

Rich Katz, Grunt Engineer NASA Office of Logic Design

Briefing: Independent NASA Test of RTSX-SU FPGAs Timing Analysis for MEC Tiger Team Results. Rich Katz, Grunt Engineer NASA Office of Logic Design. Basic Timing. n logic levels. 1 Clock Period. Ideal CLK. t PD. Basic Timing Analysis. Race of propagation delays vs. clock period

Download Presentation

Rich Katz, Grunt Engineer NASA Office of Logic Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Briefing: Independent NASA Test of RTSX-SU FPGAsTiming Analysis for MEC Tiger Team Results Rich Katz, Grunt Engineer NASA Office of Logic Design

  2. Basic Timing n logic levels 1 Clock Period Ideal CLK tPD

  3. Basic Timing Analysis • Race of propagation delays vs. clock period • FF1: CLK  Q • G1: tPD1 • G2: tPD2 • … • GN: tPDN • FF2: tSU • Slack = Period - (FF1 + G1 + … + GN + FF2) Sum of the delays

  4. Basic Timing Analysis For a “real design,” there are hundreds or thousands of “slack” calculations. Put together, they form a distribution. For a single clock there are typically a few paths that limit performance of the ATE tester. This assumes that all paths are neither multi-cycle or propagate from one edge to the opposite one. Depending on the clock frequency and distribution of slack over the design, many timing faults are not detectable. The excess delay from damage can “hide in the timing slack.” 1 Clock Period Ideal CLK tPD Slack Slack Slack

  5. Basic Timing AnalysisTiger Team Test Vehicle • Flip-flops are hooked together in a shift register configuration • Single clock • All on the same edge • N = 0 (no gate delays between flip-flops) • Slack ~ 15 ns • ATE limited to 50 MHz (20 ns) • Delta (increase) tPD≤ ~ 15 ns are not observable

  6. Note: Complete set of 46 failures (MEC Tigger Team)

  7. Note: Complete set of 46 failures (MEC Tigger Team)

  8. End of rk

More Related