The state of implementation of CIM in MAVIR. CIM Users Group 2011 Prague. Bence BAJI Process Control IT DEP. Presentation Contents. ENTSO-E business processes MAVIR Market processes MAVIR Planning processes MAVIR Operational processes MAVIR CIM tools Open issues. 2.
E N D
The state of implementation of CIM in MAVIR CIM Users Group 2011 Prague Bence BAJI Process Control IT DEP
Presentation Contents ENTSO-E business processes MAVIR Market processes MAVIR Planning processes MAVIR Operational processes MAVIR CIM tools Open issues 2
ENTSO-E business processes • 2009 - ENTSTO-E TSOs have been underlining their commitmet to apply the CIM-based data exchange format in all data exchange processes Source:ENTSO-E CIM MEP v1. 2014. november 18.
MAVIR’s market processes MAVIR implemented most of the ENTSO-E EDI data exchange formats Scheduling process (ESS) Capacity allocation and nomination process (ECAN) Settlement process (ESP) Reserve resource process (ERRP) MAVIR is affected by CIM Market integration (CME) Source: ENTSO-E EDI Library 4 2014. november 18.
Planning processes CIM-based data exchange format is required by ENTSO-E MAVIR sends PSS/E (binary) format now Decided to buy or develop a CIM-based tool in the near future Source:ENTSO-E CIM MEP v1. 5 2014. november 18.
Operational processes CIM-based data exchane format is in test phase. MAVIR sends UCTE-DEF ASCII files as usual MAVIR sends CIM-XML for every wednesday Source:ENTSO-E CIM MEP v1. 6 2014. november 18.
UCTE-DEF -> CIM-XML Converter 1st Goal: replace EDF Converter Own converter since the end of 2010 Developer: Astron Infomatika Kft. JAVA based application Fulfils MAVIR’s needs Doesn’t support the previously unused functionalities (e.g. #E and #TT) Validated with CIMdesk only 7 2014. november 18.
New CIM XML generator module Siemens Spectrum upgrade from 3.4 to 3.11 Now: Spectrum 3.8 Some modules are CIM-based, some NOT Network Analyzer module works with text based database only (DBNETD) We needed a new solution to generate CIM/XML for DACF Developer: Astron Infomatika Kft. In the site acceptance phase Some open issues 8 2014. november 18.
What is needed for CIM DACF Load Flow solution Node Voltage and angle Power flow Limit violation • Transmission system model • Generation schedules • Load schedules • Switching schedules • Transformer info • Equipment Topology State Variables 9 2014. november 18.
Generating method 1 • Populate CMMS with power system model • Generate MRIDs • Common Model Management System + • Information Model Manager +Transmission Network App. • CIM-based master model repository and model manager and user interface and network analyzer • Model export back to text based database (DBNETD) • Model export to CIM-based RDF or XDF files 10 2014. november 18.
Generating method 2 • New JAVA application pre-process the model • Create Equipment and Static Topology • Populate the NA Dadabase from DBNETD • Copy EQ + static TP to Network App. servers • New FORTRAN procedure • Create Dynamic Topology and State Variables 11 2014. november 18.
Generating method 3 • New JAVA-based generator • Process the created models • Generate ENTSO-E CIM-XML files 12 2014. november 18.
MAVIR’s CIM Solution +/- • Based on ENTSO-E MEP v1 and ready for the Profile v2 • Manual and Automatic mode • Provides CIM-XML for DACF and 2DACF • Provides „full” model for CAO (Central Allocation Office) • Generates EQ+TP+SV or ME • Configuration files (e.g. important network parts) • Does complete topological processing (e.g. Topological islands) • Supports incremental model exchange (just need headers) • One way converter (only CIM-XML export) • CMMS is new for us • Validated with CIMdesk only • 3W Transfomer = 3 * 2W Transformer 13 2014. november 18.
Open issues • X-nodes, Common Objects? • Profile v1 referenced on draft standards • System modeling issues • What should we keep under 120 kV? • No live or default value for a mandatory attribute? • Lack of complete validation tool (functionally) • ENTSO-E Network Modeling Database? • Is CIMdesk enough? • Lack of examples • We need stronger CIM community 14 2014. november 18.