District Construction. Additional contracts to be let through September = 266. Manpower Summary. Crawfordsville Snapshot. $219M/67 contracts Terre Haute SR641 Bypass LafayetteUS231 Bypass Tippecanoe Co. SR25 Hoosier Heartland. Fort Wayne Snapshot. $381M/177 projects
E N D
Crawfordsville Snapshot • $219M/67 contracts • Terre Haute SR641 Bypass • LafayetteUS231 Bypass Tippecanoe Co. • SR25 Hoosier Heartland
Fort Wayne Snapshot • $381M/177 projects • IR-29710 SR 14 Added Lanes • IR-30160 US 24 Fort to Port • IR-30161 “ • IR-30162 “ • IR-30784 “ • IR-30294 SR 3 Added Lanes • SIR-28977 SR 1 Added Lanes • SIR-30874 I-69/US 20 Interchange • SR-29135 US 33 Added Lanes • SR-32714 US 30 Resurface
Greenfield Snapshot • $1.1B/239 contracts • R-28149 US27 in Richmond • R-29560 US40 in Richmond • SR-28942 US27 in Union County • SIR-30106 US31 In Kokomo • SIR-30108 US31 in Kokomo • IB-28951 CR 200N over US31 in Kokomo • IR-29149 I-70 interchange at 465 east • IR-29900 I-70 at Mt. Comfort Rd. • IR-31104 I-70 Design Build Post to SR9 • IR-28974 US31 203rd to 216th St • IR-28929 US40 in Cumberland • IR-30025 I-465 west Leg at US136 • IR-31230 I-465 west leg Sam Jones to 21st • IR-31358 I-465 west leg at I-74 • IR-30230 I-465 west leg at I-70 • IR-30155 I-465 north side at Keystone • IR-30710 I-465 north side • R-28931 SR44 Shelbyville SR 9 to McKay • SR-29022 SR44 Shelbyville to Franklin
LaPorte Snapshot • $610M/177 contracts • Cline Avenue • Borman Expressway • US 31 corridor • Hoosier Heartland
Seymour Snapshot • $391M/159 contracts ($135M for Madison/Milton) • SR 46 Bypass in Bloomington • Added travel lanes SR 135 • I74 Pavement & slide repair • Madison/Milton Bridge
Vincennes Snapshot • $1.1B/97 Contracts • $380M active • $827M to be let (I69) • I-69 (Sections 1, 2, & 3) • US 231 Corridor • SR56/US150/SR37 French Lick to Mitchell Corridor