1 / 10

Objective ATC 02.7

Objective ATC 02.7. ESSIP Plan 2013. Ingrid FEIJT DSS/EIPR 13.09.2013. Comprehensive Explanation (1/2). Implementation of Approach Path Monitoring (APM) functions. Can be considered as an extension of MSAW (alert to a/c proximity to terrain or obstacle) in the final approach.

heaton
Download Presentation

Objective ATC 02.7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

  2. Comprehensive Explanation (1/2) • Implementation of Approach Path Monitoring (APM) functions. • Can be considered as an extension of MSAW (alert to a/c proximity to terrain or obstacle) in the final approach. • ECAC applicability (except Georgia, Greece and Slovak Republic). • Depending on airspace organisation, it might include a lower portion of TMAs and CTR. This objective is not applicable to the en-route airspace. • Military applicability: Military ANSPs that provide radar service to GAT traffic. ESSIP Plan 2013 / Objective ATC 02.7

  3. Comprehensive Explanation (2/2) • APM checks the extrapolated track positions (based on Surveillance data-current track position performing a linear extrapolation using detected ground speed and rate of climb/descent), applying QHN correction and identifies the predicted or actual conflicts against the terrain during the final approach. • Terrain can be build up using digital terrain data or set of polygons that sufficiently accurate shape the vertical environment. • FP data is not used. • APM requires an appropriate presentation of predicted / actual conflicts to the tactical controllers and ATC supervisor. • APM requires careful optimalisation / tuning to minimise false alarms. ESSIP Plan 2013 / Objective ATC 02.7

  4. What is new or has changed for ESSIP Plan edition 2013 • Removal of Georgia, Greece and Slovak Republic from the applicability list. ESSIP Plan 2013 / Objective ATC 02.7

  5. Link to European ATM Master Plan • [CM-0801] – Ground Based Safety Nets (TMA, En Route) ESSIP Plan 2013 / Objective ATC 02.7

  6. Most important SLoA(s) • ASP01 “Implement the APM function. Put into service ground-based safety tool systems and associated procedures supporting the APM function.” • ASP to check the compliance of the implemented APM with the requirements stated in the specification, the related guidance material and the relevant training and safety requirements. ESSIP Plan 2013 / Objective ATC 02.7

  7. Finalisation Criteria • Ensure that Ground systems have been upgraded to support the APM function. • Ensure that the technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA). • Ensure that the APM function is in operational use. • Ensure that the training plans have been updated and a training package has been developed by the ANSP for the use of APM functions. ESSIP Plan 2013 / Objective ATC 02.7

  8. Supporting Material • The EUROCONTROL specification for APM issued in May 2009 (edition 0.9) which is still a draft. • The EUROCONTROL Guidance Material for APM issued in May 2009, Edition 1.0 This if for guidance only, and is not compulsory. ESSIP Plan 2013 / Objective ATC 02.7

  9. ESSIP Report 2012 • The progress implementation is stagnant, compared to 2011. • Majority of the States declared to have plans for implementation by end 2013. • Achieving ATM MP (IP1) in time could be jeopardised. ESSIP Plan 2013 / Objective ATC 02.7

  10. Contacts • Objective Coordinator: FEIJT, Ingrid +32 2 729 5044 ingrid.feijt@eurocontrol.int • DNM Objective Expert(s): BAKKER, Ben +32 2 729 3149 ben.bakker@eurocontrol.int DROZDOWSKI, Stanislaw +32 2 729 3760 Stanislaw.DROZDOWSKI@eurocontrol.int ESSIP Plan 2013 / Objective ATC 02.7

More Related