An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

  2. Comprehensive Explanation (1/2) • Implementation of Minimum Safe Altitude Warning (MSAW) function. • ECAC applicability (except Greece and United Kingdom). • Requires implementation by all ATC units providing radar services to GAT traffic within En-route airspace, TMAs and CTRs. • Military authorities: Military ATC authorities are invited to consider implementation of MSAW level 2 when providing ATS surveillance services to GAT. ESSIP Plan 2014 / Objective ATC 02.6

  3. Comprehensive Explanation (2/2) • MSAW checks the extrapolated track positions (based on radar data = current track position and linear extrapolation using ground speed) and identifies the predicted or actual conflicts against the terrain. • Terrain can be build up using digital terrain data or set of polygons that sufficiently accurate shape the vertical environment. • Conflict is declared if a/c track is below the minimum safe altitude (usually 500 to 700 feet above the terrain) intends to do so in short distance in time (<= 2 minutes). • Some FP data like Cleared Flight Level (CFL) might be used to suppress false alarms. • MSAW requires an appropriate presentation of predicted / actual conflicts to the tactical controllers and ATC supervisor. • MSAW requires careful optimisation / tuning to minimise false alarms. ESSIP Plan 2014 / Objective ATC 02.6

  4. Link to European ATM Master Plan • [CM-0801] – Ground Based Safety Nets (TMA, En Route) ESSIP Plan 2014 / Objective ATC 02.6

  5. Most important SLoA(s) • ASP01 “Implement the MSAW function. Put into service ground-based safety tool systems and associated procedures supporting the MSAW function.” • ASP to check the compliance of the implemented MSAW with the requirements stated in the specification, the related guidance material and the relevant training and safety requirements. ESSIP Plan 2014 / Objective ATC 02.6

  6. Finalisation Criteria • Ensure that Ground systems have been upgraded to support the MSAW function. • Ensure that the technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA). • Ensure that the MSAW function is in operational use. • Ensure that the training plans have been updated and a training package has been developed by the ANSP for the use of MSAW functions. ESSIP Plan 2014 / Objective ATC 02.6

  7. Supporting Material • The EUROCONTROL specification for MSAW issued in September 2009 (edition 0.9) which still a draft. • The EUROCONTROL Guidance Material for MSAW issued in May 2009, Edition 1.0 • EUROCONTROL Guide ‘Safety Nets Ensuring Effectivenes’ dated 21 May 2011 This if for guidance only, and is not compulsory. • Council Decision of 30 March 2009 endorsing the European ATM Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC) ESSIP Plan 2014 / Objective ATC 02.6

  8. ESSIP Report 2013 • MSAW started to be implemented at ACC level by mid 90’s across the ECAC area already. • Progress has been made compared to 2012. • Most States declared to have plans for implementation by end 2016 end of the full operational capability date. ESSIP Plan 2014 / Objective ATC 02.6

  9. Contacts • Objective Coordinator: FEIJT, Ingrid +32 2 729 5044 ingrid.feijt@eurocontrol.int • DNM Objective Expert(s): BAKKER, Ben +32 2 729 3149 ben.bakker@eurocontrol.int DROZDOWSKI, Stanislaw +32 2 729 3760 Stanislaw.DROZDOWSKI@eurocontrol.int ESSIP Plan 2014 / Objective ATC 02.6