An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR 19.09.2014

  2. Comprehensive Explanation (1/2) • Implementation of ground-based Short Term Conflict Alert (STCA) safety net • ECAC – wide applicable • Requires implementation by all ATC units that provide surveillance (= radar) services to General Air Traffic (GAT) within En-route airspace, in the Terminal Area (TMA) and or Control Zone (CTR). • For Military Authorities:Military ATC authorities are invited to consider implementation of STCA level 2 when providing ATS surveillance services to GAT. ESSIP Plan 2014 / Objective ATC 02.2

  3. Comprehensive Explanation (2/2) • STCA checks the extrapolated track positions based on radar data (current track position) and performs a linear extrapolation using the detected ground speed and predicts or establishes an actual conflict between a/c. • A conflict is declared if a/c tracks are separated less than the minimum separation thresholds. • Some Flight Plan (FP) data like Cleared Flight Level (CFL) can be used to suppress false alarms. • STCA requires appropriate presentation of predicted/actual conflicts to the tactical controllers and ATC supervisor. ESSIP Plan 2014 / Objective ATC 02.2

  4. What is new or has changed for ESSIP Plan edition 2014 • Deletion of REG01 SLoA. ESSIP Plan 2013 / Overview LSSIP 2012

  5. Link to European ATM Master Plan • [CM-0801] – Ground Based Safety Nets (TMA, En Route) ESSIP Plan 2014 / Objective ATC 02.2

  6. Most important SLoA(s) • ASP01 “Implement STCA systems and associated procedures in line with EUROCONTROL Specification and related guidance material in En-Route airspace, applicable TMAs and Military ATC units providing radar services.” • ASP03 “Develop safety assessment for the changes, notably ATC systems and procedures that will implement STCA – level 2 functionality and associated procedures.” ESSIP Plan 2014 / Objective ATC 02.2

  7. Finalisation Criteria & Closed Questions • ASP01 – STCA function is implemented, documented and in operational use. • ASP03 – The Safety Assessment report including safety arguments for the changes has been delivered to the NSA and a notification of acceptance was received. • STCA implemented at ACC level? • STCA implemented in all TMAs / Towers within CTRs that provide radar services? • STCA parameters tuned to the operational environment (traffic, suppression of alarm in pre-defined areas, look-ahead time, warning time)? • Safety assessment done and accepted by NSA? • Notification of acceptance received from NSA? ESSIP Plan 2014 / Objective ATC 02.2

  8. Supporting Material • EUROCONTROL Specification for Short Term Conflict Alert, updated Edition 1.1, dated May 2009 • EUROCONTROL Guide “ Safety Nets Ensuring Effectiveness, dated 21 May 2011 • EC-Regulation (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services and amending Regulation (SU) No 691/2010 • EC-Regulation (EU) No 1035/2011 of 17 October 2011 laying down common requirements for the provision of air navigation services and amending Regulations (EC) No 481/2008 and (EU) No 691/2010. • Council Decision of 30 March 2009 endorsing the European ATM Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC) • Relevant ESARR documents • Safety assessment methods ESSIP Plan 2014 / Objective ATC 02.2

  9. ESSIP Report 2013 • 10 States reported LATE. • Implementation delays / not achieved due to: • implementation of a new ATC System • Implementation and/or validation/verification of STCA before putting into operation delayed • Implementation of STCA in TMA area delayed • Need to implement STCA to avoid impact on safety and achievement of expected safety benefits ESSIP Plan 2014 / Objective ATC 02.2

  10. Contacts • Objective Coordinator: FEIJT, Ingrid +32 2 729 5044 ingrid.feijt@eurocontrol.int • DNM Objective Expert(s): BAKKER, Ben +32 2 729 3149 ben.bakker@eurocontrol.int DROZDOWSKI, Stanislaw +32 2 729 3760 Stanislaw.DROZDOWSKI@eurocontrol.int ESSIP Plan 2014 / Objective ATC 02.2