All Experimenters’ Meeting

All Experimenters’ Meeting. June 04, 2012. Shutdown 2012. Machine Status: LINAC – Operational for NTF (3 days a week) ~1 week supervised access starting Thursday TeV & Muon Rings – Part available for tours with approval and appropriate training Power Outages: Tuesday , June 5 th

kapono
Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting June 04, 2012

  2. Shutdown 2012 Machine Status: LINAC – Operational for NTF (3 days a week) ~1 week supervised access starting Thursday TeV & Muon Rings – Part available for tours with approval and appropriate training Power Outages: • Tuesday, June 5th MI20 – AM (0800-1200) MI40 – PM (1300-1700) • Wednesday, June 6th MI30 – AM (0800-1200) MI50 – PM (1300-1700) • Thursday, June 7th MI12 – AM (0800-1200) MI10 – PM (1300-1700) • Friday, June 8th MI8 – AM (0800-1200) MI65 – PM (1300-1700) • Tuesday, June 12 MI62 – AM (0800-1200) MI52 – PM (1300-1700) • Wednesday, June 13 MI60 – AM (0800-1200)

  3. Shutdown 2012 Power Outages Continued: • Friday, June 15th@ 0700-0730 Master Substation will be back-fed from the Kautz Road Substation. All of the site with the exception of Main Injector and Village will go down. • This outage includes Wilson Hall, Education Center, CMS Remote Control Room, NML, all Experimental Halls, and Control Rooms. • Feynman Computer Center and Grid Computing Center plan run off generators during the outage. Power Curtailment: • We have a contract with Energy Curtailment Specialists • June 1st – September 30th • Firm Service Level Contract – Site below 25MW • We can have 10 events, up to 6 hours each. • Test usually happens in August, will probably occur in June this year. • Will not need to reduce power as in the past. Most accelerators are off. We will monitor levels.

  4. Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - http://www-ad.fnal.gov/ops/schedule.html ANU - http://www-cons/ Proton Source -http://www-ad.fnal.gov/proton/protonsched/shutdown2012.html