1 / 21

S afety Funding Application SUM CaNTON Road Corridor

S afety Funding Application SUM CaNTON Road Corridor. SUM Canton Road Corridor Project Safety Improvements. Background SUM-CR66 Canton Rd Safety Study – County Engineer. SUM-CR66 Canton Road PID82594 Originally awarded: $481K PE + $2 million CO Safety approved Fall 2006

Download Presentation

S afety Funding Application SUM CaNTON Road Corridor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety Funding ApplicationSUM CaNTON Road Corridor SUM Canton Road Corridor Project Safety Improvements

  2. BackgroundSUM-CR66 Canton Rd Safety Study – County Engineer • SUM-CR66 Canton Road PID82594 • Originally awarded: $481K PE + $2 million CO Safety approved Fall 2006 • Raised median between US224 and Arcadia • 1 mile widening 4 to 5 lanes south of Arcadia to Sanitarium • New signal at Springfield Lake Drive intersection (completed 2012) • Access management • Sidewalk / Bikepath along west side

  3. BackgroundSUM-SR91/CR66 (US224 jct) Safety Study – ODOT • SUM-91-0.00 Canton Rd PID89113 • Originally awarded: $350K PE Tier II Safety approved Spring 2010 • Dual NB LT lanes and new EB RT lane at US224 intersection • Eliminate/relocate driveways between US224 and Old Home • Widening 4 to 5 lanes north of Old Home to Linwood • Access management • Redoubles need for County project’s raised median south of US224

  4. BackgroundCanton Road Access Alternative Study SUM-91-0.00 Canton Rd PID 89113 • Widening for dual LT on south leg encompasses the length of the raised median on the south leg of the US224 • ODOT assumes northern end of SUM-CR66 Canton Rd PID 82594 – Raised median • Inherited need to address directional access for business drives given concerns raised at previous pubic meetings for SUM-CR66 Canton Rd PID 82594

  5. Canton Road Access Alternative Study Rear Service Road Alternatives • Significant R/W take • Affects drive-thru circulation of fast food locations - Excessively circuitious • Substantial increase of turning traffic volumes at Meadows/Arcadia intersection • Requires realignment of offset approaches • Introduces warrant for undesired signal too close to US224 intersection • Disruption to the surrounding Village residential area • Excessive increase to overall project cost N $$

  6. Canton Road Access Alternative Study U-Turn Alternatives U-turns as originally proposed in Alternative Study • Conflicts with US224 EB Right Turn overlap • Requires realignment of offset approaches • Undesirably too close to US224 intersection

  7. U-Turn Locations moved to • suitable tee-intersections • 500’ to 600’ from ends of left • turn restrictions SR91 SR91 at Linwood Road US224 CR66 • Raised median extended • approx. 300’ further south. • Eliminates realignment of • Meadows/Arcadia intersection. CR66 at Springfield Lake Drive

  8. Co-Sponsored Safety Funding Application 4 • SUM-SR91/CR66 Canton Rd • PID89113 • SUM-91-0.00 Canton Rd • PID89113 SUM-CR66 Canton Road PID82594

  9. Location Safety RankingChronic high crash location(s) • SR91 Section north of US224 • 2011 SA Urban NonFwy • Chronic HSP Location (2008 HSP #3 – Safety Study) • History of identification on past Hot Spot and Congestion Lists • Persistently identified on AMATS High Crash List – Top 50 (2008 AMATS #2; currently 2012 #30) • US224 at SR91/CR66 Intersection • 2012 SA Urban Intersection #16 • Chronic HSP Location • 2012 AMATS #5 • CR66 Section south of US224 • Persistent appearance on AMATS High Crash List - Top 50 (2008 AMATS #7; currently 2012 #9)

  10. Crash Data Summary, 2010-2012

  11. Collision Diagram, 2009-2011 SUM CR-66 Canton Road Corridor south of US-224

  12. Collision Diagram, 2009-2011 SUM SR-91 Canton Road Corridor north of US-224 SUM US-224 at SR-91 Intersection

  13. Problem Statement • SR-91/CR-66 Canton Road section is heavily congested area at the US-224 intersection • Rear-end and left turn angle crashes at the US-224 intersection • Prominent NB left turn / EB right turn traffic volumes • Significant delay/back-ups at the signal. • Numerous commercial driveways within functional area of intersection • Access/Driveway Issues • Angle, sideswipe and rear-end crashes due to left turn ingress/egress at driveways • Numerous high traffic generating commercial drives

  14. Recommendations • US-224 Intersection • Create dual NB LT lanes • Add EB RT lane at US224 intersection • Canton Road CR-66 south of US-224 • Add raised median on south leg to just south of Meadows/Arcadia • Widen 4 to 5 lanes to Springfield Lake Drive • Provide pavement for U-turns at Springfield Lake Drive • Access Management – Driveway definition • Sidewalk on west side • Canton Road SR-91 north of US-224 • Eliminate/relocate driveways between US-224 and Old Home • Widen 4 to 5 lanes to Linwood • Provide pavement for U-turns at Linwood • Access Management – Driveway definition • Sidewalk on east side

  15. Proposed Conceptual US 224 at Canton Road Intersection • Realignment Driveway access management EB RT lane Raised median Dual NB LT lanes

  16. Proposed Conceptual CR66 Canton Road South of US 224 • Raised median • TWLTL Access management • U-turn

  17. Proposed Conceptual SR91 Canton Road North of US 224 • U-turn • Access • management • TWLTL • Realignment

  18. Capacity Analysis • Significant Reduction in Overall Delay for Peak Hours

  19. Rate of Return Analysis • RW and Construction estimates adjusted with higher contingency to credibly meet the project expense • Acquisition costs • Urban setting with dense commercial development. • Rate of Return is conservatively still about 13% on total cost

  20. Project Funding Plan PID89113 • Local funding commitment • ODOT administer project; Spring programmatic • Funding plan totals do not include any prior projects’ funding

  21. Safety Funding Application PID 89113 Note: The remaining 4HJ7 funding in PID82594 ($1.78 million FY2016) would return to the safety fund once the environmental document is complete

More Related