An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the LAV FEE electronics M. Raggi LNF G. Corradi, C. Paglia, D. Tagnani LNF SELF PVWG WGCERN 25/04/2011

  2. Outline • The FEE components • Status of the FEE production • Prospects for the rest of 2011

  3. FEE LAV VME 9U Remote Control CAN in, CAN out USB Local Control Vth_H and Vth_L test points and adjust trimmers Sum 1 to 16 Sum 1 to 16 Sums 1 to 4, 5 to 8, 9 to 12, 13 to 16 Sums 1 to 4, 5 to 8, 9 to 12, 13 to 16 Sum 17 to 32 Sums 17 to 20, 21 to 24, 25 to 28, 29 to 32

  4. Mezzanine production status • 100 ToT mezzanine already produced • Each mezzanine has two channels • All of them have been mounted • To be tested (electric test and burn in) • Enough to equip more than 5 FEE boards

  5. Sum mezzanine • Sum 4 analog signals • 10 pieces already produced • The boards have been mounted • Needs electric and burn-in tests

  6. Voltage regulator production • Produce ±6V • 10 pieces in production • PCB delivery expected in 20 days • Needs electric and burn-in tests

  7. 9U motherboard production • The Gerber files have been sent to the firm • A first bunch of 5 PCB boards will be delivered at the mid of June

  8. Other equipment • ToT mezzanine test board • Used to test the ToT mezzanine before the installation • Allows to access both PCB sides • Local thr setting boards • Used to set the thr in absence of CPU remote programming firmware • 9U board front panel • Prototype already produced

  9. Future plans • Receive and assemble a first full 9U FEE prototype before the end of July. • Test the system extensively during fall • Validate the FEE before the end of November 2011 • Start a first massive production (1/2 of total) before the end of 2011