1 / 4

PERFORMANCE BASED LOGISTICS (PBL): A TOTAL LIFE CYCLE SYSTEM MANAGEMENT APPROACH

PERFORMANCE BASED LOGISTICS (PBL): A TOTAL LIFE CYCLE SYSTEM MANAGEMENT APPROACH. NGSS PBL Goals. Increase reliability, maintainability, and supportability Influencing early design Focusing on system design for operational effectiveness

Download Presentation

PERFORMANCE BASED LOGISTICS (PBL): A TOTAL LIFE CYCLE SYSTEM MANAGEMENT APPROACH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PERFORMANCE BASED LOGISTICS (PBL):A TOTAL LIFE CYCLE SYSTEM MANAGEMENT APPROACH

  2. NGSS PBL Goals • Increase reliability, maintainability, and supportability • Influencing early design • Focusing on system design for operational effectiveness • Provide an interdisciplinary engineering management process • Evolves and verifies an integrated life cycle balance set of system solutions • Produces customer satisfaction • Develop a total system design solution that balances • Cost • Schedule • Performance • Risk. • Provide a system that can be produced economically and supported through the life cycle. • Open Systems Approach tp maximize internal and external interface capability of the systems/ subsystems using open system approach.

  3. NGSS and Phases of PBL Time “Beginning” “Bridge” “Model” • LPD 17 • Process Development • Prominent Process System Integrator (PSI) Role • Best Precursor for DD(X) • Supply Chain Operational Reference (SCOR) methodology • Close cooperation with Navy • DD(X) • Fully matured PBL model • Develop in conjunction with other programs. • Influence design for supportability. • Design and develop the support system • Link system performance, availability (Reliability, Maintainability, Supportability), process efficiency (system operations, maintenance, logistics support), and life cycle. • LHD 8 • First Performance Based Logistics (PBL) project • NAVSEA/NAVSUP Guide used. • Product/Equipment centered. Reliability, reduced logistics footprint, and reduced life cycle/Total Ownership Cost (TOC) are most effectively achieved through inclusion from the very beginning of a program.

  4. NGSS Near Term Strategy and Activities • Mature the NGSS PBL PSI Role • Cross-platform pollination – (full process integration for all PBL efforts) • Integrate and align PBL planning and implementation • Post Shakedown Availability, Planning Yard, and Software Support Activity management infrastructure • Continuous Improvement of processes and personnel • Training and high quality standards. • Become a Center of Excellence for PBL • Develop and refine partnerships to accomplish a coordinated supply chain recommendation • LHD 8, LPD 17, DD(X), and Deepwater • Original Equipment Manufacturer Subject Matter Experts • Develop a draft Memorandum of Agreement (MOA) • Addresses the roles and responsibilities of each respective industry/government organization

More Related