1 / 21

LATAR BELAKANG

UNIVERSITAS GUNADARMA FAKULTAS TEKNIK SIPIL DAN PERENCANAAN PERENCANAAN FONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTA Nugraha Sadeli Utama NPM 10307065. LATAR BELAKANG.

meryl
Download Presentation

LATAR BELAKANG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNIVERSITAS GUNADARMAFAKULTAS TEKNIK SIPIL DAN PERENCANAANPERENCANAANFONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTANugrahaSadeliUtamaNPM 10307065

  2. LATAR BELAKANG Dalampembangunansuatuproyekkonstruksidibutuhkanperencanaanstruktur yang kuat, aman, dannyaman. Salah satubagianbangunanuntukmendukunghaltersebutadalahfondasi. Fondasimerupakanbagian yang pentingdalambangunan, karenaitupertimbanganteknisdalammemilihtipe, menentukankedalamandandimensi, kapasitasdukungdanmerancangstrukturnyamerupakanhal yang harusdipelajaridenganbaik.

  3. TUJUAN TujuandaripenulisantugasakhiriniadalahuntukmerencanakandesainfondasitiangborpadaproyekGedung IKPT Jakarta yang meliputi: • Dimensifondasitiang bor. • Dayadukungfondasitiang bor. • Penurunanfondasitiang bor. • Dayadukung lateral fondasitiangbordandefleksiakibatbeban lateral. • DimensiPile Cap.

  4. BATASAN PENULISAN Padapenulisantugasakhirini, penulismembatasipembahasanpada: • Perencanaandesainfondasitiangbormenggunakancara manual. • Perencanaandesainfondasitiangbormenggunakanbantuan program Plaxis.

  5. LANDASAN TEORI

  6. FONDASI Fondasiadalahbagiandarisuatustrukturbangunan yang berfungsiuntukmeneruskanbebandaristrukturatasketanah, baikakibatbebanvertikalmaupunbeban horizontal.

  7. JenisFondasiSecaraUmum

  8. FondasiTiangBor Hampir di setiapproyekkonstruksifondasitiangmerupakanteknologifondasidalam yang telahjamakdipergunakan. Salah satumetodepemasangantiangfondasiiniadalahdengansistem bor. Kedalamandan diameter daritiangbordapatdivariasidenganmudah, fondasitiangbordipakaiuntukbebanringanmaupunbebanberatsepertibangunanbertingkattinggidanjembatan.

  9. ContohPelaksaaanKonstruksiTiangBor

  10. METODE PERENCANAAN Diagram AlirTugasAkhir

  11. Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual

  12. Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual

  13. Diagram AlirAnalisisDesainFondasiTiangBordengan Program PLAXIS

  14. HASIL PEMBAHASAN • Digunakandimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m. • Berdasarkanhasilperhitungandiperolehdayadukungsebesar:

  15. Penurunan yang terjadiberdasarkancara manual: Penurunanyang terjadiberdasarkan program PLAXIS:

  16. Sedangkanuntukpenurunankelompoktiangdiperolehpenurunansebesar 0,0020 m sampai 0,0101 m. • Dayadukung lateral tiangadalahsebesar: Defleksiyang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.

  17. Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.

  18. KESIMPULAN • Berdasarkanhasilperhitungan, diperolehdesaindimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m. • Berdasarkanhasilperhitungandiperolehdayadukungfondasitiangborsebesar 65,02 ton sampai 127,82 ton. • Berdasarkanhasilperhitungandiperolehpenurunanfondasitiangbortunggalsebesar 0,0234 m sampai 0,0468 m. Sedangkanuntukpenurunankelompoktiangdiperolehpenurunanterbesarsebesar 0,0020 m sampai 0,0101 m.

  19. Berdasarkanhasilperhitungandiperolehdayadukung lateral tiangborsebesar 11,22 ton sampai 17,61 ton. Defleksi yang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m. • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.

  20. SARAN Dalammelakukanperencanaanfondasihalpenting yang harusdiperhatikanadalahkarakteristiktanahdimanabangunantersebutakandidirikan. Olehkarenaitumutlakdiadakanpenyelidikantanah (soil investigation) terlebihdahulu. Selainitu, untukperancanganselanjutnyasebaiknyaseismic designikutdiperhitungkan.

  21. Gambar Detail • FondasiTiangBor • Detail Pile Cap Type-1 • Detail Pile Cap Type-2 • Detail Pile Cap Type-3 • Detail Pile Cap Type-4 • Detail Pile Cap Type-5 • Detail Pile Cap Type-6 • Detail Pile Cap Type-7 • Detail Pile Cap Type-8 • Detail Pile Cap Type-9

More Related