1 / 11

NETC N7 Status Update to AIM FRB

NETC N7 Status Update to AIM FRB. 4 May 2010. Overview. NAVEDTRA 130B, 131B, 135C, 132 NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM AIM/CPM status support of JDTA w/ participating Center updates AIM/CPM status support of OCCSTD capture/validation

oscar-cantu
Download Presentation

NETC N7 Status Update to AIM FRB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NETC N7 Status Update to AIM FRB 4 May 2010

  2. Overview • NAVEDTRA 130B, 131B, 135C, 132 • NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM • AIM/CPM status support of JDTA w/ participating Center updates • AIM/CPM status support of OCCSTD capture/validation • NETC/OPNAV N15 integration of NETC domain/acquisition community business processes • AIM/CPM integration status w/ Perception • FEA/BCA capability plans for CPM • PPP Repository status

  3. NAVEDTRA 130B, 131B, 135C, 132 Status • 130B • 131B • 135C • 132

  4. NAVEDTRA 136 (ILE) Re-write • Current re-write status • Leslie Lucas (team lead) distributed continuity draft of Plan through Design phases for working group review on 30 Apr • AIM/CPM impact • JDTA Tab - Rename “Skills Hierarchy” Report “Job Duty Task Analysis” Report • Project Tab - Rename “Performance Requirements” branch of Projects to “CTTL” • Project Tab – Rename “COI with ISD Considerations” report to IMDP • Projects Tab- Rename “ISD Considerations” link on C/M/L/S to “IMDP/Learning Strategy Elements”

  5. AIM/CPM Support of JDTA and Participating Center Updates • CPM Rel 4.0 operational 27 Jan 10 • JDTA NETCINST 1510.4 promulgated 24 Feb 10 • Center projects: • CPPD/CSFE: Curriculum Developer with integrated AIM user training • CSFE • SLC • CEODD • CID

  6. AIM/CPM Support of OCCSTD Capture/Validation • NETC N74 coordination with NAVMAC • CPM JDTA tab being adapted for OCCSTDS specific requirements • Capability to be part of CPM Rel 5.0 • AIM team working with NAVMAC and NETPDTC on OCCSTDS data interface with Perception LAS for fleet validation of preliminary OCCSTDS

  7. Integration of NETC Domain/Acquisition Community Business Processes • Roy Hoyt & Roger Thorstad to provide status

  8. AIM Interface with Perception LAS • Support for NETC N51 assessment program and NAVMAC OCCSTDS fleet validation process • Planning for implementation via Perception API • Participants: • NAVMAC and NETC N51 as SMEs • NETPDTC as Navy technical agent for Perception • AIM team on Web service data output from AIM I, AIM II, and LO Module

  9. FEA/BCA Capability Plans for CPM • FEA – NETCINST 1500.6 • BCA – NETCINST 1510.3 • Business processes still being defined and integrated into NAVEDTRA 136 • AIM team involved in business process definition and initial design of CPM support for FEA/BCA downstream

  10. PPP Repository Status • AIM team coordinating with NETC N74 (Leslie Desenburg) on options to post PPP repository contents (AIM and other) for easy viewing

  11. Questions?

More Related