1 / 5

All Experimenters’ Meeting

All Experimenters’ Meeting. November 28, 2011. Accelerator Operation Summary. From : November 21, 2011 (0000 hours) To: November 28, 2011 (0000 hours). Calendar Week # 47 NuMI Weekly Integrated Intensity 8.31E18 protons

pisces
Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting November 28, 2011

  2. Accelerator Operation Summary From : November 21, 2011 (0000 hours) To: November 28, 2011 (0000 hours) Calendar Week # 47 NuMI Weekly Integrated Intensity 8.31E18protons BNB Weekly Integrated Intensity 4.98e18protons MTest Weekly Integrated Intensity 2.16e14protons Beam Hours To NuMI134.00hours Beam Hours To MiniBooNE130.40 hours

  3. Status /Work Completed/Plans • Proton Source • KRFV Solenoid replaced: Bad power cable • BRF1 PA change out • LRF5 multiple component failure • LRF1 Driver Tube/Socket failure • Tuning • Main Injector • MI8 Line transmission: Possible vertical shunt problem • Studies and Tuning • NuMI • Two accesses to investigate air leak on absorber skid • Running Well • MiniBooNE • Access to change filter on RAW skid. Flow looks good now. • Running well • MTest • T-978 CALICE and T1012 TAUWER shared beam time • MTA • Ran: Beam Studies

More Related