60 likes | 730 Views
All Experimenters’ Meeting. November 28, 2011. Accelerator Operation Summary. From : November 21, 2011 (0000 hours) To: November 28, 2011 (0000 hours). Calendar Week # 47 NuMI Weekly Integrated Intensity 8.31E18 protons
E N D
All Experimenters’ Meeting November 28, 2011
Accelerator Operation Summary From : November 21, 2011 (0000 hours) To: November 28, 2011 (0000 hours) Calendar Week # 47 NuMI Weekly Integrated Intensity 8.31E18protons BNB Weekly Integrated Intensity 4.98e18protons MTest Weekly Integrated Intensity 2.16e14protons Beam Hours To NuMI134.00hours Beam Hours To MiniBooNE130.40 hours
Status /Work Completed/Plans • Proton Source • KRFV Solenoid replaced: Bad power cable • BRF1 PA change out • LRF5 multiple component failure • LRF1 Driver Tube/Socket failure • Tuning • Main Injector • MI8 Line transmission: Possible vertical shunt problem • Studies and Tuning • NuMI • Two accesses to investigate air leak on absorber skid • Running Well • MiniBooNE • Access to change filter on RAW skid. Flow looks good now. • Running well • MTest • T-978 CALICE and T1012 TAUWER shared beam time • MTA • Ran: Beam Studies