An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NA62 Gigatracker cooling requirements • Gigatracker (GTK) modules will operate in vacuum and under high radiation • Module has to be replaced on a regular basis • Cooling system required to avoid performance loss • The operation temperature for the frontend electronics will be 5°C or lower • Low material budget for the cooling system

  2. Gigatracker Module support and alignement structure Cooling plate Readout chip (12 x 20 mm), heat production ca. 3.2W per chip (2 W/cm2) beam direction Sensor, silicon pixels (30 x 60 mm) 3D schematic drawing of the GTK module

  3. Materials in the sensor area The total material budget (material in the beam) allowed for the GTK module is 0.5% X0(radiation length).

  4. Our proposal: Microchannel cooling • Goals ofdevelopment: • Integration ofmicrochannelsintofrontendelectronics • Cooling via an separate coolingplatewithmicrochannels • 150mm thickness • 300mm thickness • Benefits: • Uniform temperaturedistribution in theareatobecooled • Small DT betweencoolantandreadoutchip => reduced thermal stress • Single-phaseandtwo-phasecoolingpossible • Technology studiedat EPFL with strong supportofindustrialpartners • Mutual understandingtoshareknowledge (EPFL <> CERN) • Specifityofourapplication: • Verylow material budget • Low heatflux

  5. Tentative layoutofmicrochannelsfortheGigatracker • area to be cooled ~30 x 60mm • channel length ~40mm • channel cross section 50mm x 50mm • separation walls 25mm thick • heat flux in the cooling region 2W/cm2 • Support and Connection of services outside the sensor area and on one side • Single-phase cooling • Open pointsforthe prototype: • Thermal connectionofthereadoutchiptothecoolingplate • Total pressure in thechannels

  6. Production priciples • Micro channels etched in thin wafer • Cover wafer is bonded to channels • Cover contains holes for inlet and outlet • Cover wafer will be thined by etching in the critical beam area

  7. C6F14 cooling liquid of choice • radiationhard • thermallyandchemicallystable • nonflammable, nontoxic, nonconducting • knownandusedat CERN (CMS and Atlas Tracker) • used in liquid phase • C3F8is an option in caseoftohighpressure in thecoolingplatefor C6F14

  8. Fluid temperature difference 12bar pressure drop 2bar pressure drop • Temperature difference between inlet and outlet for channels of 50mm x 50mm

  9. CFD model – boundary conditions Coolingplate fixedtemperatureatthebackside Readoutchip 2 W/cm2, 12 x 20 mm Sensor, siliconpixels 30 x 60 mm • all remaining walls are considered adiabatic, since the GTK will operate in vacuum • heat source is the volume of the readout chip

  10. Temperaturedistributionl=70W/mK Heat transfer coefficient between chips and cooling plate of l=70W/mK, for a material thickness of 25 mm

  11. Temperaturedistributionl=7W/mK Heat transfer coefficient between chips and cooling plate of l=7W/mK, for a material thickness of 25 mm

  12. Temperaturedistributionl=0.7W/mK Heat transfer coefficient between chips and cooling plate of l=0.7W/mK, for a material thickness of 25 mm

  13. Plans for the next months September: • production of a prototype at the EPFL clean room • preparation teststand (cooling unit, instrumention …) • design of connecting component • further development of the CFD-Model Oktober/November: • commissioning teststand • first test at room temperature • preparation of test at cold temperature, cryostat • assembly prototype and mockup chips Thermal interface to be designed according to chip design and fabrication!!!