Lau Gatignon, 19 February 2013. EATM Contribution - NA62. K12 / ECN3. The ECN3 crane renovation has been completed with a reception test on the 25 th of January and a second final approval last week.
E N D
Lau Gatignon, 19 February 2013 EATM Contribution - NA62
K12 / ECN3 • The ECN3 crane renovation has been completed with a reception test on the 25th of January and a second final approval last week. • NA62 wants to perform a field map of the MNP33 magnet in the course of 2013, the preferred period being around September/OctoberIs this possible (power, cooling?) • At some stage the front end alignment needs to be checked, the 4th MTR turned by 180o and T10 to be consolidated.