Facilities & Planning Construction & Major Maintenance Projects, EH&S and Service Requests

Facilities & Planning Construction & Major Maintenance Projects, EH&S and Service Requests. GO OREGON! Stimulus Projects. Stimulus Projects in Completion Art Building Interior, Entrances & Exteriors Improvements CH Corridors - Fire Sprinklers CH - 7 New Classrooms CH - new roof

rad
Download Presentation

Facilities & Planning Construction & Major Maintenance Projects, EH&S and Service Requests

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facilities & Planning Construction & Major Maintenance Projects, EH&S and Service Requests

  2. GO OREGON! Stimulus Projects Stimulus Projects in Completion Art Building Interior, Entrances & Exteriors Improvements CH Corridors - Fire Sprinklers CH - 7 New Classrooms CH - new roof ML - new roof ML & SB1 - Restroom Improvements NH & CH - Restroom Improvements NH - Corridors & Classroom Upgrades NH – Corridor Sprinklers OND Theaters 90 & 92, Classroom Improvements

  3. 2009-2010 Current Construction Areas

  4. ASRC, Urban Plaza & Montgomery Green Street Projects • Academic & Student Recreation Center (ASRC) $72.5 M • Student Recreation Center, 10 new classrooms, City archives, School of Social Work, OUS Chancellors Office, and the PSU Bike Hub • Retail: Pita Pit, Green Line Market (PSU Bookstore Expansion), Kaplan Testing, New Taste of India, UPS Store and More! • Designed to consume at least 30% less energy then a standard commercial building and to self-generate up to 6000w via rooftop solar panels • ASRC will be fully open Winter term 2010; PSU Outdoor Program now open! • Montgomery Street Improvements & Urban Plaza Upgrades • Installation of bio-swales and planters by fountains. Collaborative project with PDC & OSD to capture storm water runoff in an effort to improve water quality in the city

  5. Lincoln Hall Seismic and Systems Upgrade • State of Oregon Economic Stimulus Funding $1.5 million • All exterior windows replaced – by Oregon manufactures and contractors • Associated energy savings resulted in less HVAC equipment needed throughout building. • Completion this month • Deferred Maintenance $29.2 million • Seismic upgrade, mechanical and electrical upgrade, finishes, and space programming. • New roof with features for day lighting • Enhanced natural lighting throughout building • Foot traffic will be rerouted around construction fencing • Significantly improved instructional and performance space • Reopening for Fall Term 2010

  6. Science 2 & Science Research & Teaching Center & Hazardous Waste Facility (SRTC) ● Building infrastructure upgrades and the expansion and modernization of labs and teaching space. Limitation $45.3 M, various funding sources including General fund, grants, gifts, COPs, and Bonds, ● Construction of a New hazardous waste facility to support research and instruction ● Building fully occupied during construction. General pool classrooms relocated to provide some surge space ● Air circulation improvements to more effectively capture fumes in labs, and greater energy savings What you will see over the school year: ●Seismic upgrade with steel trusses on exterior, a new roof, and a new exhaust system on roof ● Remodel all corridors and many labs. ● Interior moves: 4th Floor Move Summer and Fall 2009 1st, 2nd & 3rd Floors East - Winter 2010 1st, 2nd & 3rd Floors West - Spring 2010 B1 & B2 East - Summer 2010 B1 & B2 West - Fall 2010 ● Completion of the project May 2011

  7. Campus Steam & Chilled Water Loop Oregon Economic Stimulus Funded Project $17.5 million ● To improve and expand the network of heating and cooling piping throughout campus that forms our Campus Loop ● Leading to energy savings, more reliable service and increased capacity to heat and cool campus buildings ● Construction starts 7:30am and will last until 3:30pm Monday through Friday.; Intermittent noise and vibration ● Expect to see 20 to 30 foot deep trenches, pre cast utility tunnels installed, piping inserted through the tunnels ● Foot traffic will be rerouted around construction ● Completion of project Fall 2010

  8. Campus Projects • Seismic Upgrades to Skybridges • Project Completion this month • Bicycle Garage near Blumel Hall • Expansion to house up to 75 bicycles in a secured facility near student housing; completion January 2010 • UCB Parking Entrance and Retail • Improvements to Fifth Avenue entrance on Max Light Rail line • New parking entrance on Harrison Street • New Bicycle Parking Center with 48 Parking Spaces • Incubator Retail Kiosks • Completion by May 2010

  9. Campus Projects • Walk of the Heroines Project, Phase 1 • A community based project that creates a special place to honor women who have illuminated our lives. • Installation of a water feature, seating, naming wall and natural landscaping • Installation of an interactive kiosk provides stories and pictures of the women honored • Paving and landscaping features • Project complete (final permit on fountain pending new City requirements). • www.woh.pdx.edu/heroines

  10. Questions? Francis McBride: mcbridef@pdx.edu Mark Fujii: fujiim@pdx.edu Facilities & Planning - Reception 503-725-3738 Ernest Tipton: tiptone@pdx.edu Ron Blaj: rblaj@pdx.edu our website www.fap.pdx.edu Look for “Construction Projects”

  11. Environmental Health & Safety • Our Role: • Help employees to work safely. • Help supervisors provide employees with the information, skills, & tools they need to work safely. • Help administration to provide a safe workplace. • Help maintain compliance with environmental health & safety regulations (DEQ, OSHA and others).

  12. Environmental Health & Safety • Services offered by: • Research Laboratories Support • Hazardous Waste Management • Hazardous Material Management in Construction • Hazard Evaluation in the Workplace • Safety Training • Ergonomics Assessments • and much more ...

  13. Environmental Health & Safety • Requesting Service from EH&S: • Chemical Spill Emergency – Call 5-4404. • Hazardous Waste Pick-Up – • Submit a work request: Includes chemicals, • bio-waste, sharps containers. • Ergonomic Assessments – place a Service request. • Odor Reports – Call Facilities 5-3758. • All Other Services - Submit a work request or call 5-3758.

  14. Facilities Work Order System • AiM (www.fap.pdx.edu/workorder): • User name & password are required. • User name will be your Odin name. • Account must be created in AiM. • Send your name, department, phone number, & email to Sheryl Reed at sheryr@pdx.edu or call 5-4352.

  15. Facilities Work Order System • Many fields are populated for you. • Fields can be edited if desired. • Required fields are outlined in red. • No longer necessary to select a “problem code”. • Write a description, select a building (called “property”) & save.

  16. Facilities Work Order System • Transaction number given immediately. • Link to the work order is emailed to you. • Emails sent to you when completed, or if backlogged or canceled. • Surveys are forthcoming. • Instructions available on info page. • www.fap.pdx.edu/workorder

  17. Recycling & Trash Bin Consolidation • Future City of Portland requirement: 75% diversion rate by 2015 • Current campus diversion rate is approximately 42% • Best practice: Pair recycling bins with trash cans • Remove extra trash bins from classrooms • Consolidate trash & recycling bins in hallways • Questions? Call PSU Recycles at 5-4300.