1 / 15

Fifth Annual Meeting of the WG: Objectives and Agenda

Fifth Annual Meeting of the WG: Objectives and Agenda. Jennifer H. Madans U.S.A. Summary of work to date. 1 st meeting (Washington, DC, Feb 2002): Agreed to develop short and long sets of internationally comparable disability measures using the ICF as a framework. Census questions priority.

spaterson
Download Presentation

Fifth Annual Meeting of the WG: Objectives and Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fifth Annual Meeting of the WG: Objectives and Agenda Jennifer H. Madans U.S.A.

  2. Summary of work to date • 1st meeting (Washington, DC, Feb 2002): Agreed to develop short and long sets of internationally comparable disability measures using the ICF as a framework. Census questions priority. • 2nd meeting (Ottawa, Canada, Jan 2003): Established link between purpose and aspects of measurement via matrix. • 3rd meeting (Brussels, Belgium, Feb 2004): Equalization of opportunities selected as purpose of general measure.

  3. Summary of work to date 4th meeting (Bangkok, Thailand, Sept 2004) • Draft of general measure agreed upon conceptually; revisions and statement of rationale to be completed • Workgroup formed to develop implementation protocols to test and field general measure • General measure to be pre-tested in as many countries as possible • Workshops planned to inform local countries about the WG general measure and the planned pre-testing

  4. Summary of work to date • Two extended sets to be proposed • Purpose: assessing equalization of opportunities • Module that will go into existing national surveys • Set 1: Additional questions to be developed in the area of basic activities • Set 2: Will examine aspects of participation that are and are not covered in current surveys and how environmental factors are to be included • A new workgroup on methodological issues formed to address full population coverage and other issues

  5. Major accomplishments since Bangkok • Draft implementation protocols developed: • Objectives and evaluation plan for testing • Cognitive test plan • Translation guidelines • Enumerator training protocol • Sample design issues • Plan for tabulation, analysis and report writing • Two regional workshops successfully implemented • June 20-22, 2005 / Nairobi, Kenya • September 19-20, 2005 / Rio de Janeiro, Brazil

  6. Major accomplishments since Bangkok • 15 countries offered funding to conduct pre-tests • $5000.00 for Kenya, Gambia, and Vietnam to conduct cognitive and field tests • $1000.00 for India, Philippines, Seychelles, Lesotho, Malawi, Congo, Mauritius, Uganda, Egypt, South Africa, Palestine, and Tanzania to conduct cognitive portion of the pre-test • 7 countries have submitted test plans • South Africa can conduct the full pre-test without WG funding

  7. Plan for 5th meeting • Each session has specific objectives • Presentation of draft position papers will be followed by focused discussion that will address specific session objectives • There will be products and a work plan following each session

  8. Meeting and session objectives Workgroup on general measure • Present questions recommended for pre-testing, the accompanying rationale, and the Q by Q specifications • Identify potential areas for revision • Discuss potential use of the general measure as a screener

  9. Meeting and session objectives Workgroup on implementation • Present the implementation protocols currently in use • Discuss lessons learned from the workshops about the protocols • Identify potential areas for revision

  10. Meeting and session objectives Report on the regional workshops • Present proceedings and outcomes of the regional WG workshops in Africa and Brazil • Present the results of the UNESCAP/WHO pre-tests • Discuss plan for future pre-tests and workshops

  11. Meeting and session objectives Conceptual issues related to disability measurement • To examine what it means to use the ICF as a framework for disability measurement • To discuss the meaning of words that we use to describe and measure disability and identify areas where terminology lacks sufficient clarity / specificity • To clarify how the proposed general measure captures basic activities and identifies a population at high risk of participation limitations

  12. Meeting and session objectives Workgroup on extended measures • Present alternative proposals for 1st extended set • Present proposal for 2nd extended set • Discuss purpose of extended sets, data needs, and relationship to general measure • Discuss timing of WG activities related to development of extended sets • Develop priorities for work to be accomplished

  13. Meeting and session objectives Workgroup on methodological issues • Discuss issues of proxy and non-response and mode of survey administration in relation to health questions • Identify the impact of excluding the institutionalized population from disability surveys • Discuss methods to estimate and control bias in disability statistics • Discuss other methodological challenges related to collecting national data on disability

  14. Meeting and session objectives UNSD report • Introduce international data and metadata on disability related to the Demographic Yearbook system and present available results of pre-testing • Discuss how different approaches to measurement impact disability prevalence

  15. Meeting and session objectives Strategic Issues • Review country reports for planning purposes • Discuss other international efforts related to WG work • Review use of WB DGF and plan for future funding • Discuss WG governance issues Next steps

More Related