1 / 22

IMPLEMENTATION OF THE NEW IAG STRUCTURE

IMPLEMENTATION OF THE NEW IAG STRUCTURE. Gerhard Beutler Astronomical Institute University of Berne Sidlerstrasse 5, CH - 3012 Bern gerhard.beutler@aiub.unibe.ch. IAG Council Tuesday, July 1, 2003 Hotel Royton, Sapporo. Contents. Review of the IAG restructuring process Motivation

trish
Download Presentation

IMPLEMENTATION OF THE NEW IAG STRUCTURE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMPLEMENTATION OF THE NEW IAG STRUCTURE Gerhard Beutler Astronomical Institute University of Berne Sidlerstrasse 5, CH - 3012 Bern gerhard.beutler@aiub.unibe.ch IAG Council Tuesday, July 1, 2003 Hotel Royton, Sapporo

  2. Contents • Review of the IAG restructuring process • Motivation • Development • Commissions and Services • Inter-commission Committees • Membership, Outreach • IGGOS • Initial IGGOS Structure • In particular: new chair! • IGGOS Schedule 2003-2005

  3. Motivation for a new IAG • General Johann Jacob Baeyer (1794-1885) is the “founder” of IAG. • He urged the establish-ment of the European Arc Measurement -- for scientific reasons! • In 1899 the ILS was founded by IAG!

  4. Motivation for a new IAG • Geodesy went through a (r)evolution in the 2nd half of the 20th century: • space age & space geodesy • age of computers • new understanding of IAG services (IGS, IERS) • IAG Structure in essence stable since 1951!

  5. Development of New IAG • Section II Symposium in 1998 in Munich • IUGG General Assembly in Birmingham in 1999: Symposium “Geodesy beyond 2000”. • K.P. Schwarz et al. ask for a restructured IAG with a focus; The IAG Review Committee was created with the members: • F. Brunner, J. Dickey, M. Feissel, R. Forsberg, I.I. Mueller, R. Rummel, F. Sanso, K.P. Schwarz • IAG Retreat 2000 was organized, new Statutes and ByLaws were created.

  6. Development of new IAG • The new IAG Statutes and Bylaws were accepted at IAG Scientific Assembly in Budapest (September 2001). • New elements: • Sections abandoned, four Commissions • IAG Services on same level as Commissions, represented in IAG EC • IAG project(s) • IAG Outreach Branch • Inter-commission Committees, Individual membership

  7. The new IAG structure • IAG Bureau (Tscherning, Beutler, Sideris) • Commission 1: Reference Frames: Drewes, Shum (VP) • Commission 2: Gravity field : Jekeli • Commission 3: Earth rotation and geodyna-mics: V. Dehant • Commission 4: Positioning and Applications Rizos, Willis (VP) • Service reps. in IAG EC: Neilan, Rothacher, Schuh, at large: Fortes, Merry.

  8. The new IAG structure • Inter-commission Committees (ICCs) shall handle well defined, important and permanent tasks. • ICCs have a steering committee with Presi-dent, Vice-President appointed by IAG EC • The establishment of an ICC has to be has to be approved by the Council (ByLaws 2.3.g)

  9. The new IAG structure: ICCs • ICC on Theory (ICCT): • President Peiliang Xu • Steering committee (to be set up) • Broader advisory committee as interface to other communities • Working groups of type 1: Joint with Commissions • Working groups of type 2: Internal working groups

  10. The new IAG structure: ICCs • ICC on Geodetic Standards (ICCGS): • President of Planning Group: Bernhard Heck • Mission: platform for models, procedures and algorithms, investigates the consistency of models & procedures, evaluates the numerical values of constants and parameters and propo-ses current best estimates. • WGs on Consistency of models and procedures on Product Standards, Fundamental Constants and Parameters proposed. • Planning Group meeting this week, implement?

  11. The new IAG structure: ICCs • ICC on Planetary Geodesy (ICCPG): • Presidents of Planning Group: Michael Sideris, Véronique Déhant • Mission: Use geodetic methods for planetary missions (“race to Mars”) etc. • Early planning phase • Work is important, should continue • Establishment in 2003 or 2005 (IAG Scientific Assembly)?

  12. IGGOS Motivation • IGGOS looks for a long-term stability of global geodetic infra-structure. • IGGOS is the focal point for IAG acti-vities of this decade. • IGGOS is based on 3 pillars of geodesy.

  13. IGGOS Definition • IGGOS stands for Integrated Global Geo-detic Observing System. • IGGOS monitors the Earth system as a whole through the IAG Services. • IGGOS is based on the 3 pillars of geodesy • geometry and kinematics, • Earth orientation and rotation, and • gravity field and its variability

  14. IGGOS Vision • IGGOS provides the scientific and infrastructural basis for all geodetic global change research. • IGGOS integrates techniques, models, and approaches in order to achieve consistency, long-term reliability and understanding of geodetic, geophysi-cal, geodynamical and global change processes.

  15. Science Rationale & Plan • IGGOS has a central theme and a master product. • Central Theme: • Provide basis for Global-scale mass transfer in the system Earth and its geodetic conse-quences. • The master product is a consistent set of the global geometric and gravimetric reference frames.

  16. Initial IGGOS Structure • These general principles are observed: • IGGOS will be based on the existing IAG Services. • IGGOS is not taking over tasks of the well working IAG services. • New IGGOS entities will be established only if there is a stringent requirement.

  17. Initial IGGOS Structure • Key elements of the initial IGGOS structure: • IGGOS Program Board as the central oversight entity. • Working Groups with tasks independent of those of the IAG services. • Science Council representing the geodetic community.

  18. Initial IGGOS Structure

  19. IGGOS Schedule 2003-2005 • Proposal to Establish the Integrated Global Geodetic Observing System (IGGOS) as IAG’s first Project was finalized and made available to IAG EC on January 28, 2003, modified June 17, 2003 • The last meeting of the IGGOS Planning Group will take place on Wednesday, July 2, 2003 in Sapporo.

  20. Chair for IGGOS Definition Phase • Chair of planning committee (Beutler) not available for IGGOS definition phase. • Prof. Chris Reigber (GFZ, Potsdam) is proposed as new Chair. • Qualification: • Past chair IGS GB, Past Pres. IERS DB, CSTG, project manager CHAMP, CO-PI GRACE. • Retirement in 2004, available till 2005 (GFZ).

  21. IGGOS Schedule 2003-2005 • IGGOS Definition Phase 2003-2005 • Define structure of the “final” IGGOS Project. • Develop IGGOS Science Plan. • Approval of IGGOS project by IAG EC at IAG Scientific Assembly 2005. • Start of IGGOS Project on October 1, 2005.

  22. Decision by IAG Council • Request approval of establishment of ICC on Theory. • Request approval of establishment of IGGOS as first IAG Project. • Approve establishment of ICC on Geodetic Standards? • Approve ICC on planetary geodesy for 2005 or delay decision to 2005?

More Related