1 / 10

MJC Measure E Bond Program Board Update February 6, 2008

MJC Measure E Bond Program Board Update February 6, 2008. Public Safety Building. Project Goals Co-locate all emergency services in a central location Improve response times Shelter all fire fighting apparatus Provide housing for both men and women. Public Safety Building.

Download Presentation

MJC Measure E Bond Program Board Update February 6, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MJC Measure E Bond Program Board Update February 6, 2008

  2. Public Safety Building Project Goals • Co-locate all emergency services in a central location • Improve response times • Shelter all fire fighting apparatus • Provide housing for both men and women

  3. Public Safety Building Project Schedule • PMP shows start of construction August 2008 • Swing Space is nearly complete • Hazardous Msterial removal to start mid-February • Construction to begin end of March, 2008, five months ahead of schedule.

  4. Public Safety Building Project Committee • Preston Birdwell (CC) • Gary Mendenhall (CC) • Greg Elam (CC) • Joseph Doherty (CC) • Craig Konklin (Cal Fire) • Barry Rudolph (Cal Fire) • Steve Herzog (Cal Fire) • Jim Toy (Cal Fire)

  5. Public Safety Building • Campus Master Plan Project Location

  6. Public Safety Building • Site Plan

  7. Public Safety Building • Floor Plan

  8. Public Safety Building • Rendering

  9. Public Safety Building • Currently working on bid marketing • Project will bid for next month • Ground Breaking to be scheduled by the college and district

  10. Question and Answer January 11, 2008

More Related