70 likes | 162 Views
ECS and LS1 20140219 Update. Xavier Vilasís -Cardona. T he main changes have started. Main changes in ECS during LS1 Hardware architecture Move to virtual Machines New SPECS Masters Software WIN CC OA. System check up. Organise a CALO ECS week
E N D
ECS and LS120140219 Update Xavier Vilasís-Cardona Calo Meeting - Xvc
The main changes have started • Main changes in ECS during LS1 • Hardware architecture • Move to virtual Machines • New SPECS Masters • Software • WIN CC OA Calo Meeting - Xvc
System check up • Organise a CALO ECS week • Check problem of TVB (datapoint problem) • Sort out • What is working • What is still not working • What is not tested • Two steps • Next week : (during LHCb week) • Initial check up by Xvc and information gathering • Test system configuration and study known problems • Systematic test week : (week 10, after LHCb week) • See what susbsystems are available • And if data taking is possible • Take pedestals and cosmics only with calo • Mask channels • Have experts available Calo Meeting - Xvc
Backup Calo Meeting - Xvc
Former Hardware Structure Calo Meeting - Xvc
Current Hardware Structure Calo Meeting - Xvc
Migration Strategy • Old PCs have been renamed • xxdaqhvc01w to xxdaqhvc01s-specs • cadcs0Xw to cadcs0Xw-opc • xcdaq01 to xcdaq01-ccpc • Auto-start of DIM and PVSS has been disabled • New PCs are virtual machines running on linux with former name adapted • xxdaqhvc01, cadcs01, etc. • Projects have been migrated using Clara’s scripts • New and old computers run in parallel • Old computers service the hardware connection • New computers run the WINCCOA projects Calo Meeting - Xvc