MODAPS PIP Report August 11, 2009 1-877-711-1856 759461
Summary of MODAPS Production 8/11 • Forward Processing C5, 5.1 and 4.1: • Terra forward processing is as close to real time as possible; Aqua is 2 days behind • There was a delay in receiving the new PGE01 LUT for the Aqua maneuver on day 218 • We are reprocessing PGE41 (MCD12Q1), C5 Land Cover Quarterly processing for years 2002-2007 • Years 2002-2005 have completed • We have processed PGE87 (MCD12Q2), C5 Land Cover CMGs through year 2006 • We have completed production of PGE42 (MCD12C1) for years 2001-2007 • Collection 5.1 Burned Area Reprocessing • The leading edge for this reprocessing is at day 2003/198.
Summary of PGE Deliveries to SDST (8/11) Collection 5 • Atmospheres: • A pre-delivery of the Terra Deep Blue PGEs was received on July 22. • We are expecting a new version of PGE69 for Aqua C5.1 Mandriva this week. • Work is continuing on a new version of PGE06 for Mandriva. • Land: • A new version of PGE11(LSR) for Mandriva was delivered. Collection 6 • Level 1: • A new version of PGE02 (L1b) for Terra and Aqua has been baselined. • Land: • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)
Summary of Science Testing (8/11) • Atmospheres: • Results of science tests for PGE69 Terra Mandrake and Mandriva have been approved. • A science test for PGE69 Aqua Mandrake and Mandriva will be run in parallel with forward processing. • Land Science Testing: • A science test for PGE72 (for land water mask) is running. Nine of 12 16-day periods have completed. This is expected to complete by the end of this month. • We have completed generating a 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) to be used for collection 6 science testing. • Test results for C6 PGE16 are under review by Dr Wan. • L1 Science Testing: • A second science test for C6 PGE01 was processed through LSR and control points and is under review. • Mandriva Science Testing: • PGEs 01, 02, 03, 07, 08, 43 and 44 have passed Mandriva testing. • PGEs 60 (C5) and 90 (C5 and C6) have completed science testing and are under review. • A chain test from L0 through the land dailies has completed and is under review. The LSR and L1b destriper codes are still being reviewed. • Land PGEs are being tested using inputs generated on the Mandrake system • PGE 33 is being reviewed by the developer • PGEs 3,7,8,11,12,13,14,15,22,43,44,46,75,80 and 84 were tested. • A second science test for PGE16 completed and failed. Test results have been forwarded to the developer. • Tests for 8- and 16-day PGEs completed; PGEs 21,45,31,58,25,35,29 and 34 passed, PGE72 failed. • Work is continuing on the atmospheres PGEs.