50 likes | 146 Views
MODAPS PIP Report. December 15, 2009. 1-866-738-1275 9454131. Summary of MODAPS Production 12/15. Forward Processing (C4.1, 5, 5.1 and IST) Terra and Aqua forward processing are as close to real time as possible. Reprocessing
E N D
MODAPS PIP Report December 15, 2009 1-866-738-1275 9454131
Summary of MODAPS Production 12/15 • Forward Processing (C4.1, 5, 5.1 and IST) • Terra and Aqua forward processing are as close to real time as possible. • Reprocessing • The special IST reprocessing for Aqua completed for November 1, 2007 through June 30, 2008. The period from July 4, 2002 through October 31, 2007 will start later this week. • The reprocessing of the MCD12Q2 land cover products has completed; MCD12Q1 should complete later today or early tomorrow.
Summary of PGE Deliveries to SDST (12/15) Collections 5 and 5.1 • Atmospheres: • An updated PGE04 C5.1 for Terra Deep Blue was installed for science testing. • A new version of PGE04 C5.1 was delivered for correction to dark target. • Another version of PGE04 C5.1 with changes to Deep Blue is expected shortly. • Land: • A new version of PGE41 to correct SDS fill values for QC file types has been baselined. • A new version of PGE36 (GPP Montana) has been baselined. • A test version of C5.1 PGE86 (Burned Area) was installed for science testing. A fix to the Loader Module to handle processing periods that have less than 95% of input data available is expected shortly.(Terra only PGE is in operations, Terra and Aqua PGE is in CM) • We have received PGE61. This is the new code for the MOD44B Vegetation Continuous field (VCF) yearly level 4 tiled product. Collection 6 • Level 1: • A new version of PGE02 (L1b) for Terra and Aqua was installed for science testing. • A new version of PGE01 (Geo and L1a) was installed for science testing. A new version with further changes is expected. • Atmospheres: • We have received C6 versions of PGE03 (for use with LeoCat), PGE06 (pre-C6 change) and a new 3km aerosol process for C6 PGE04 • Land: • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)
Summary of Science Testing 12/15 • Atmospheres: • Another 5-day science test (1 Aqua, 4 Terra) for PGE04 Terra deep blue completed and is under review. This test was reprocessed with the recent correction to dark target and additional changes to deep blue. The test will be reprocessed again when we receive the next changes to deep blue. • Test data sets of L1 through cloud mask have been generated for April 2005, Terra and Aqua for atmospheres C6 science testing. • A C6 test for Terra PGE06 completed and is under review. • Land Science Testing: • A science test for C6 PGE16(LST) has completed and is under review. • A second 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) has started. The test is expected to complete late December.
Summary of Science Testing (12/15) • L1 Science Testing: • A second science test for C6 PGE01 was processed through LSR and control points and is under review. • A C6 PGE02 science test for 32 days of Terra and 32 days of Aqua has completed. Results are okay. Downstream C5 land codes are processing now. Atmosphere products will also be generated for the month of January 2003. • Mandriva Science Testing: • A second chain test from L0 through the land 8 and 16 day codes is currently has completed for land and atmosphere with the exception of atmospheres Clear Sky Radiances. • PGEs 01,02,03,06,07,08,11,12,13,14,15,16,21,22,25,29,30,31,33, 35, 43,44,45,46,58,69,75,60,80,84 and 90 have passed Mandriva testing. • Land PGEs were tested using inputs generated on the Mandrake system • PGE72 failed.