MODAPS PIP Report. January 27, 2009. 1-877-711-1856 759461. Summary of MODAPS Production 1/27. Collection 5 Forward Processing Terra and Aqua are as close to real time as possible.
E N D
MODAPS PIP Report January 27, 2009 1-877-711-1856 759461
Summary of MODAPS Production 1/27 • Collection 5 Forward Processing • Terra and Aqua are as close to real time as possible. • Collection 5 Aqua atmospheres processing stopped on December 31, 2009. All forward processing is now collection 051. • LST C41 for Terra and Aqua is running in parallel with C5 until collection 6 starts in 2010.
Reprocessing (1/27) • Collection 5 Land Reprocessing • We are processing 4 additional tiles of BRDF in the Arctic region from start of mission. (2000/048 - 2001/153 and 2002/001-176 have completed. • The monthly snow products have been reprocessed through 2005 for all periods impacted by the maneuver reprocessing. This should be completed by Wednesday, January 28. • Collection 051 Aqua atmospheres Reprocessing • The leading edge is 2005/293 • The current x-rate is 14.4x • The average x-rate since the start of reprocessing is 13.6x • Collection 041 Land LST Aqua and Terra Reprocessing • Reprocessing began at data day 2007/001 • The leading edge is 2007/258 • The current x-rate is 6.8x
Summary of PGE Deliveries to SDST (1/27) • Level 1: • A Terra L1B for collection 6 has been baselined. • Work has continued on the Collection 6 PGE01 and the initial delivery is expected in February. • Atmospheres: • All atmospheres PGEs have been converted to Linux. PGEs 55, 57, 69, 70, 81 and 89 have been baselined; PGE69 failed in science testing and has been returned to STTG • New versions of Terra PGEs for C051 are expected in February. • Land: • We have received the collection 6 PGE16 (LST). • Initial delivery of collection 6 PGE11 is expected in February. • A problem with the meta data in the Linux version of PGE 28 needs to be corrected. A new Linux version is expected. • A new version of PGE23 (uses L2G light input) has been baselined
Summary of Science Testing 1/27 • Atmospheres: • An IRIX/Linux comparison test completed for PGEs 55, 57 and 70. Results have been approved and we are waiting for a PCR. • An IRIX/Linux comparison test for PGEs 69 failed and is being investigated. • A one month reference test (April 2005) using de-registered L1B data has completed and is under review. Modifications need to be made to the level 3 code to complete the evaluation. A second science test with the level 3 modifications completed and is under review. • A one-month science test for PGE 83 C051 for April 2005 has completed and is under review. • Land Science Testing: • A 16-day, 10 tile test for L2g-lites completed and in under review. • A new Linux/Irix science test for PGE60 that included the fix for 1 tile has completed. The results have been approved and we are waiting for a PCR • A PGE23 (L2G lites) science test has completed and is under review • There was a 35% increase in performance • L1 Science Testing: • Four 1-day tests for the Collection 6 L1B (Terra and Aqua) have been completed • An additional 1-day golden tile test has completed and is under review • Mandriva 2008 Science Testing: • An additional test for PGEs 07 and 08 will be run using PGE01, 02 and 03 input generated on the Mandrake system. This test completed and is under review. • 16 days of Terra and Aqua were processed for Land • 3 days of level 2 and daily products were processed for atmospheres • The atmospheres PGEs that have recently been converted to Linux have not been tested on Mandriva.