An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODAPS PIP Report September 29, 2009 1-866-738-1275 9454131

  2. Summary of MODAPS Production 9/29 • Forward Processing C5, 5.1 and 4.1: • Terra and Aqua forward processing are as close to real time as possible. • Preliminary C5.1 Burned Area reprocessing • The 2003 Terra only re-processing will start tomorrow followed by the 2003 Terra and Aqua reprocessing.

  3. Summary of PGE Deliveries to SDST (9/29) Collections 5 and 5.1 • Atmospheres: • An updated PGE04 C5.1 for Terra Deep Blue has been baselined. • Land: • A new version of PGE36 (GPP Montana) was received. • A test version of C5.1 PGE86 (Burned Area) has been baselined. • A special version of PGE08 was received to support the processing of clear-sky IST over the Greenland Ice Sheet. • A new version of PGE11(LSR) for Mandriva was delivered. Collection 6 • Level 1: • A new version of PGE02 (L1b) for Terra and Aqua has been baselined. • A new version of PGE01 (Geo and L1a) was baselined. • Atmospheres: • We have received an new version of PGE03 for use with LeoCat • We have received a pre-C6 version of PGE06 • We have received the new 3km aerosol process for C6 PGE04 • Land: • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)

  4. Summary of Science Testing (9/29) • Atmospheres: • A 5-day science test (1 Aqua, 4 Terra) for PGE04 Terra deep blue has completed and is under review. The baseline was reprocessed and a third test using an updated PGE04 is currently processing. An additional 16 days of Terra will be tested when these results are approved. • Test data sets of L1 through cloudmask have been generated for April 2005, Terra and Aqua for atmospheres C6 science testing. • Land Science Testing: • A science test for PGE72 (for land water mask) has completed. • We have completed generating a 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) to be used for collection 6 science testing. • PGE16 has been approved for Mandriva. A C6 science test will be needed.

  5. Summary of Science Testing (9/29) • L1 Science Testing: • A second science test for C6 PGE01 was processed through LSR and control points and is under review. • A C6 PGE02 science test for 32 days of Terra and 32 days of Aqua has completed and is under review. Mandriva Science Testing: • A science test for PGE06 on Mandriva failed and is under review by SSTG. A bug in the loader module was corrected and the science test is currently reprocessing. • A second chain test from L0 through the land dailies is currently processing. • PGEs 01,02,03, 07, 08, 11, 12, 13, 14, 15, 16, 21, 22, 25, 29, 30, 31, 33, 35, 43, 44,45,46, 58,75,60,80,84 and 90 have passed Mandriva testing. • Land PGEs are being tested using inputs generated on the Mandrake system • Tests for 8- and 16-day PGEs completed; PGEs 21,45,31,58,25,35,29 and 34 passed, PGE72 failed.