An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2008 Engineering and Software Review MCS Mount Control System

  2. Highlights (Q4/2008) Fixed Jet’s CPU instability (up for 51 days) Greatly improved mount slew performance Fixed several low-level bugs Updated elevation and azimuth tuning Wrote a lot of new low-level control code Upgraded to PLCIO rev. 4 LBT Q4 2008 Engineering and Software Review

  3. Progress (Q4/2008) • Identify and correct the source of the host CPU instability (Issues 869, 1626, 1734, 1750) √ • Consolidate Az and El DSP code and check it into svn (s) (some progress) • Update FPGA code and check it into svn (not yet) • Improve slewing efficiency (Issue 1728) √ • Improve Host-to-DSP synchronization (Issues 891, 1460) √ • Fix absolute encoders (end-run for Issues 220, 362, 511, 1230) (not yet) LBT Q4 2008 Engineering and Software Review

  4. Progress (Q4/2008) LBT Q4 2008 Engineering and Software Review

  5. Open Issues • Technical • Encoder reset is not sufficiently reliable (Hardware) • Drive startup is not reliable (TPLC) • A lot of cleanup / development is required before commissioning • Schedule • Telescope time is very competitive • Financial • Significant upgrades are unfunded for this year • Resource • Very limited Engineering / Software resources for further development LBT Q4 2008 Engineering and Software Review

  6. Planning (Q1/2009) • Consolidate Az and El DSP code and check it into svn • Update FPGA code and check it into svn • Fix absolute encoders (end-run for Issues 220, 362, 511, 1230) • Add telemetry subsystem support • Some testing time scheduled in February LBT Q4 2008 Engineering and Software Review