1 / 5

LBT Q4 2008 Engineering Review

LBT Q4 2008 Engineering Review. DYB. Highlights ( Q4/2008 ). Completed all remaining documentation on Dec 22, 2008. Includes O&M manual, as-built drawings and design, control strategy, and acceptance test documentation. Open Issues. Technical None Schedule None Financial None

gene
Download Presentation

LBT Q4 2008 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2008 Engineering Review DYB

  2. Highlights (Q4/2008) • Completed all remaining documentation on Dec 22, 2008. • Includes O&M manual, as-built drawings and design, control strategy, and acceptance test documentation. LBT Q4 2008 Engineering Review

  3. Open Issues • Technical • None • Schedule • None • Financial • None • Resource • None LBT Q4 2008 Engineering Review

  4. Progress (Q4/2008) • Complete remaining documentation (Planned Nov 08) (Completed Dec 08) • Finish filling out Acceptance Test Matrix and Plan with final test results. (Completed) • Make minor edits to design documentation, O&M manual and control strategy. (Completed) • Finish edits to as-built drawings. (This is the primary speed bump due to overbooked drafting resources.) (Completed) LBT Q4 2008 Engineering Review

  5. Planning (Q1/2009) • Project complete pending any requests for clarification or modification of the documentation. LBT Q4 2008 Engineering Review

More Related