50 likes | 169 Views
LBT Q4 2008 Engineering Review. DYB. Highlights ( Q4/2008 ). Completed all remaining documentation on Dec 22, 2008. Includes O&M manual, as-built drawings and design, control strategy, and acceptance test documentation. Open Issues. Technical None Schedule None Financial None
E N D
Highlights (Q4/2008) • Completed all remaining documentation on Dec 22, 2008. • Includes O&M manual, as-built drawings and design, control strategy, and acceptance test documentation. LBT Q4 2008 Engineering Review
Open Issues • Technical • None • Schedule • None • Financial • None • Resource • None LBT Q4 2008 Engineering Review
Progress (Q4/2008) • Complete remaining documentation (Planned Nov 08) (Completed Dec 08) • Finish filling out Acceptance Test Matrix and Plan with final test results. (Completed) • Make minor edits to design documentation, O&M manual and control strategy. (Completed) • Finish edits to as-built drawings. (This is the primary speed bump due to overbooked drafting resources.) (Completed) LBT Q4 2008 Engineering Review
Planning (Q1/2009) • Project complete pending any requests for clarification or modification of the documentation. LBT Q4 2008 Engineering Review