An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2007 Engineering Review HBSC Hydrostatic Bearing System

  2. Highlights (Q4/2007) • Capillary adaptors installed on Az and EL in L-R corner. • Limited measurements made with proximity sensor • We can now read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. • Can locally save changes to flash card LBT Q4 2007 Engineering Review

  3. LBT Q4 2007 Engineering Review

  4. LBT Q4 2007 Engineering Review

  5. LBT Q4 2007 Engineering Review

  6. LBT Q4 2007 Engineering Review

  7. LBT Q4 2007 Engineering Review

  8. Open Issues • Technical • PLC Control law unknown, undocumented. • Firewall not penetrable for WinCC • Capillaries adaptors not installed in El and Az pads 1, 2 & 3 • Capillaries not installed in any El and Az pads • Capillaries uncharacterized/adjusted • Schedule • None • Financial • None • Resource • Mountain support pacing operation • Network and Firewall communications issues unresolved LBT Q4 2007 Engineering Review

  9. Progress (Q4/2007) • Capillary adaptors installed on Az and EL in L-R corner. • Limited measurements made with proximity sensor • We can now read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. • Can locally save changes to flash card LBT Q4 2007 Engineering Review

  10. Planning (Q1/2008) • Move the El and Az capillaries to the pads and resize • Systematic measurement of lift, tuning system to maximize stiffness • Replace hoses with hard pipe on level 5 • Document existing S7 code with a process flowchart (VoltsDC) • Describe new control laws correcting: • pressure OK • system shutdown when pocket pressures fail • control around pressure, not lookup table (LBT) • Rewrite PLC code using new control laws (VoltsDC) • Reduce system pressure from 120 to 95 bar. LBT Q4 2007 Engineering Review