1 / 4

LBT Q4 2007 Engineering Review

RSU Rigid Secondary Unit. LBT Q4 2007 Engineering Review. Highlights and Progress(Q4/2007). Mirror approaching completion at SESO Hexapod passed lab test and shipped to LBT. Open Issues. M2 mirror still being fabricated, close to completion, barring disaster.

angie
Download Presentation

LBT Q4 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RSU Rigid Secondary Unit. LBT Q4 2007 Engineering Review

  2. Highlights and Progress(Q4/2007) Mirror approaching completion at SESO Hexapod passed lab test and shipped to LBT

  3. Open Issues M2 mirror still being fabricated, close to completion, barring disaster. Have been unable to test hexapod control with high level software as yet.

  4. Planning • Schedule • Dry run installation of M2 hub in second week of January ‘08. Intend to test-fit and test-run hexapod in-situ on the M2 swing arm, Using the alignment telescope we can check that high-level software commands lead to sensible results. • If M2 is completed by late January, system could be ready for full install in Q1 ‘08

More Related