PIP Update

PIP Update. March 27 th 2013. Agenda. Summary Update Current Activities/Updates Startup Plans Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann - PIP Project Schedule and Budget Updates. Update. General Info Booster Beam: Running at reduced levels – need more RF!

silas
Download Presentation

PIP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update March 27th2013

  2. Agenda • Summary Update • Current Activities/Updates • Startup Plans • Upcoming Talks, Reports, Meetings Updates/Talks: • Ken Domann - PIP Project Schedule and Budget Updates

  3. Update General Info • Booster Beam: Running at reduced levels – need more RF! • Studies are underway: • Apertures / Orbit Smoothing will continue – more magnet moves in future • Optics correction for the next two weeks • Booster SS: Stations are operating – controls / shunt problems • PIP accounts should no longer be used • Booster RF cavity rework – RF1 work nearly done – testing? • Cavity from RF15 removed from tunnel yesterday – transportation today? • Spare cavity work? • Booster RF Cavity has an RF leak and will likely be removed for repair • Will swap with RF 1 • Booster RF 8 may also have a RF leak, but is operating for the moment • We will have 17/19 cavities after the next swap (up from 16) – may allow high-intensity • Booster Ferrites • Low Frequency tester – still being modified? • mu=20 cores have been ordered • RFQ – still waiting on trim / 2nd source? • HLRF – planning site visit at vendor • Linac Modulator – waiting for 9 cell components to arrive – talk next week • Booster Shielding – Scans have been written up, will be revised and transmitted to ES&H • MI Startup: no change from last time – June 1st Startup comments (Fernanda, Todd, Mary)

  4. Upcoming Talks Future Meetings: Apr. 3: • Trevor Butler - Linac Modulator Prototyping • Yuri Alexahin - Plans for Booster Studies (transition crossing, synchro-betatron coupling) To be Scheduled: • Dave Augustine - Vacuum Installations Finished and in Planning • Jean-Paul Carneiro - TraceWin 3D Simulations of the Fermilab Linac • Bill Pellico - Loss Test Scans for Shielding Assessment • John Reid - Solid State Installation - Final Report

  5. Upcoming • Reports • Update of PIP Design Report – Yearly update work • PMG & Quarterly report in April • March status update requests issued yesterday • Budget Issues – • Have not heard of any new impacts from lab budget • Still struggling with Additional Overhead Cost – no resolution yet • Working to address cost of spares - Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task