An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update June 25th2014

  2. Agenda • Summary Update • Current Activities/Updates • Ryan Crawford: Anode Supply Update • Peter Prieto: BPM Update • CY Tan: Perpendicular Cavity Update

  3. Update • Linac SBK: Working towards CDR (in June, July) • Linac LN:Working with PriTel on a solution • Linac Modulator: Build up of 25 cell – (still communicating with SLAC – finishing up some details) • Linac Beam Physics: No news • Injector: Planning on installing dimpled cathode on source A this week for testing • Booster Beam: • Cogging software work continues – low intensity studies continue • Booster optics software – New tune control works – still working on ACNET software/control • Booster Longitudinal dampers - Did some transfer studies/ Still working on firmware • Booster RF • Booster RF5 has had downstream window cut off – new ceramic window may be put on toady • Perpendicular Cavities – talk today • RF13 being prepared for testing ( alignment fixtures being installed today) by weekend should be running (Install in mid-July) • Cavity 20 – on mill • Booster Anode Supplies – update talk today • Booster Bias supplies – Third supply delivered to MI-60 and starting dis-assembly work (Monday), Bias 1 in test stand, Bias 2 waiting TS • Booster Shielding – Safety Going over data…. • Booster BPM work – talk today • Booster Absorber/Kicker – Pulsing continues in gallery with three loads, short kickers being built • Design of insert sleeve is under investigation, New offset S12 bellows being designed

  4. RF 5 removed for repair Estimated Install date Cavity RF 2 being prepared for testing Cavity RF 5 ready for new window - today • Cavities Refurbishment • 10 of 19 cavities have been refurbished

  5. Recent PIP Budget/News • Budget Issues: • Budget meeting today with Ann Nestander • General: P5 report out – PIP II is still the plan • Meetings to discuss transition PIP to PIP II underway • PMG – Next Tuesday • Lots of shutdown talk – No word • Update of RLS – Some Booster items remain • Post-Doc position for PIP – Preparing visit

  6. Upcoming Talks Future Meetings to be Scheduled: • Matt/John – New Tuner • Kiyomi Seiya - Cogging • Tom Kubicki – New Booster Cavity Plan • Bill Pellico - Loss Scans and Shielding Assessment • John Reid - Solid State Installation - Final Report