70 likes | 238 Views
PIP Update. Feb 20 th 2013. Agenda. Summary Update Current Activities/Updates Startup Schedule Highlights Upcoming Talks, Reports, Meetings Updates/Talks: Salah Chaurize - Booster Notcher Installation Ken Domann – RLS/Updates Kiyomi Seiya – Aperture scans & magnet moves. Update.
E N D
PIP Update Feb 20th 2013
Agenda • Summary Update • Current Activities/Updates • Startup Schedule Highlights • Upcoming Talks, Reports, Meetings Updates/Talks: • Salah Chaurize - Booster Notcher Installation • Ken Domann – RLS/Updates • Kiyomi Seiya – Aperture scans & magnet moves
Update General Info • Booster SS: Up and operating • SS Spares still in production – waiting for ANU to finish using anode supply • Booster Absorber (Talk Today – for sure this time) • Booster Aperture Scans and magnet moves (Kiyomi Talk) • Booster RF cavity rework – Cavity 3 being installed today and RF15 removal • Cavity 1 work - tuner work has begun (two tuners off – no surprises) • Booster Ferrites – Dennis has started physical measurements (tester back) • Physical Measurements, Low Power Testing, High Power Testing (Pat S. will help) • RFQ – Running (still sparking) – waiting on trim magnet/building source B • Modifications to source magnetics, Changed Buncher tube (8kw) • HLRF –mostly still waiting (putting together new PR) soon will place order • Linac Modulator – work continues – No news? • Linac Notch - Safety permission to operate seed source and fiber amplifiers • preliminary work on beam shaping optics • Cogging – Software work continues – but waiting for Kiyomi time • Booster Shielding –detectors placed, connected to VME, Scans on Thursday! • Booster Cavity modeling – Mohamed is using new ferrite curves • MI Startup: Word is May – not sure why not official yet? Startup comments (Fernanda, Todd, Mary) Studies forthcoming?
RFQ Injector Changed sources (added magnets) sparking Bucher power up to 8kw LINAC 7835 replacement for 5 today Retuning Linac – to match Injector BOOSTER Disconnect corrector leads at L24Install re-furbished cavity that was originally removed from L15 (a.k.a. BRF3)Align L24 long straight, all elementsRepair several BLMs in MI8 line not showing losses, document locationsLM802A,LM803B,LM803C,LM803D,LM804Repair MW804Hose replacement for V803 psInvestigate IP13-1 on half ion pumpReplace VB21 VVHTQ4 replace regulatorPG20 and PG21 replace penning gauges Building 3rdNotcher Preparing Transverse Pickup for installation Insatall RF3
Proton Improvement Plan Projection NOvA Shutdown 120 GeV LBNE g-2 8 GeV Mu2e
Upcoming Talks Future Meetings: Feb/Mar • Dave Augustine - Vacuum Installations Finished and in Planning • Jean-Paul Carneiro - TraceWin 3D Simulations of the Fermilab Linac • Dave Johnson - Progress with Linac Notcher Amplifiers • Elliot McCrory - Linac BPM Upgrades • Pellico – Shielding Testing • John Reid - Solid State Installation - Final Report • Pat Sheahan - Tuner Bias Supplies • Leonid Vorobiev - ORBIT Simulations on Booster Injection and Acceleration
Upcoming • Reports (upcoming) • Update of PIP Design Report – Yearly update work • PIP talks/Special Meetings • Budget Issues – • Working to address cost of spares • Additional Overhead Cost – impact still being looked at - Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task