An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update April 23rd2014

  2. Agenda • Summary Update • Current Activities/Updates • Ken Domann – Project Status and Budget • Matt Gardner – Linac LCW upgrades & Transformer Install

  3. Update • Linac SBK: Work progressing (CDR in June) (Working on items discussed during phone conference) • Linac Laser Notching: Received the final amp – some issues which required vendor support (not fixed) • Modulator work: EE support is proceeding with build up of 25 cell (9 cell looks good) • Linac Beam Physics: No news • Injector: Both sources up and running – next will work on larger volume source and gas mixture • Booster Beam: • Transverse damper – no news • Cogging software work continues – testing on MI cycles continues, notch creation using new system verified • Booster optics software – verification of 465 cards complete this week – testing this week tune settings • Booster Longitudinal dampers - progress continues – verification of process ( see pics) • Booster RF • Booster RF2 Cavity shipped last Friday – work will start this week on it? • RF19 – all assembled (replaced vacuum flange) - finishing up dressing cavity before testing • Looking at extra tuners (one that was stored in box and one on large bore cavity) • New Parallel Cavities – Waiting on temp measurements (some done on last cavity) • Perpendicular Cavities – working on solenoid design and testing of ferrites – buying samples • High mu cores – the rest of our sample High U cores should be here? Verify them this week! • Additional pieces will allow us to to build single tuner • Assemble three tuners and put on spare cavity – then test!! • Booster Anode Supplies –Work continues – headaches with purchasing!! • Booster Bias supplies – First one had to have some LCW re-work but is close to finish • Booster Shielding – setting up another round of scans – during cavity install & next day • Booster Nothcer – TD proceeding with building 2 more short kickers, Work on PS testing continues • May convert to new PS system during shutdown for one long kicker!

  4. Install refurbished cavity in slot 2 Pull Cavity RF 5 (need to fix taper) Pull another cavity for refurb • Cavities Refurbishment • 10 of 19 cavities have been refurbished

  5. Recent PIP Budget/News • Budget Issues: no news from DOE/Lab meeting • Another budget meeting in June (after dust settles) • General: Lots of talk about P5 and DOE – PIPII/PIP • PMG – 4/26 has been canceled – Stuart is departing • Who will replace Stuart – not sure but he has listed PIP as one of his important tasks • Lots of shutdown talk – Regular SD planning • Update of RLS – some Booster items remain • P5 should report back to lab in April – PIP impact likely • Director is interested in 20 Hz – potential users….. • Too soon to affect what we are doing • Post-Doc position for PIP is open/receiving resumes

  6. Upcoming Talks Future Meetings to be Scheduled: • Eddy – Booster damper plans (next week?) • Tom Kubicki – New Booster Cavity Plan • ?? – New tuners – plans/ideas • Bill Pellico - Loss Scans and Shielding Assessment • John Reid - Solid State Installation - Final Report