1 / 8

KEMENTERIAN KEUANGAN RI DIREKTORAT JENDERAL ANGGARAN

KEMENTERIAN KEUANGAN RI DIREKTORAT JENDERAL ANGGARAN. TATA CATA REVISI ANGGARAN TA 2014 LINGKUP DITJEN CIPTA KARYA. Semarang, 6 Mei 2014. PAGU ANGGARAN DITJEN CIPTA KARYA TA 2014. DANA CATATAN HALAMAN IV DIPA.

Download Presentation

KEMENTERIAN KEUANGAN RI DIREKTORAT JENDERAL ANGGARAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEMENTERIAN KEUANGAN RI DIREKTORAT JENDERAL ANGGARAN • TATA CATA REVISI ANGGARAN TA 2014 • LINGKUP DITJEN CIPTA KARYA Semarang, 6 Mei 2014

  2. PAGU ANGGARAN DITJEN CIPTA KARYA TA 2014

  3. DANA CATATAN HALAMAN IV DIPA

  4. AlokasiAnggaranpada RKA/KL DitjenCiptaKarya TA 2014 yang masihdiberikanCatatanHalaman IV adalahsebesar Rp.1.627.379.516.000,-, denganrincian : • PHLN yang belumefektifsebesar Rp815.036.636.000,00 antara lain untuk PNPM MandiriPerkotaan, SanitasiPerkotaan, danPeralatanPenanggulanganDaruratBencana. • Alokasiuntukpengadaankendaraanroda 2 dan 4 sebesar Rp2.416.880.000,00 yang masihmemerlukandokumenterkaitberuparisalahlelangkendaraanbermotor. • lokasiuntukpembangunan/RehabilitasiGedungsebesar Rp5.926.000.000,00 yang masihmemerlukandokumenterkaitberupaanalisaperhitunganbiayapembangunan/rehabilitasigedungdariDirjenCiptaKarya; • Alokasi yang masihterpusatsebesar Rp804.000.000.000,00, terdiriatasalokasiuntukFasilitasiPenyusunanRencanaIndukSistemProteksiKebakaran (RISPK) sebesar Rp21.000.000.000,00 sehubunganbelumditetapkanlokasikabupaten/kotasasaran, alokasiuntuk Program Pembangunan InfrastrukturPerdesaan (PPIP) sebesar Rp743.000.000.000,00 sehubunganbelumditetapkanlokasidesasasaran PPIP, danalokasiuntukPemberdayaandalamrangka MP3KI sebesar Rp40.000.000.000,00 sehubunganbelumditetapkanlokasisasaran.

  5. DATA OUTPUT CADANGAN TA 2014

  6. LINGKUP REVISI PADA DITJEN CIPTA KAYA A. RevisiAnggaran Yang DisebabkanPenambahandanPenguranganPaguAnggaranBelanja : • LanjutanPelaksanaan PNPM Mandiri, pasal 20 ayat (4) jopasal 60 ayat (2) c PMK Nomor 7/PMK.02/2014, merupakanwewenangKanwilDitjenPerbendaharaan. • Lanjutan pelaksanaan kegiatan yang dananya bersumber dari PHLN, pasal 12 ayat (3) jopasal 60 ayat (2) PMK Nomor 7/PMK.02/2014 merupakanwewenangKanwilDitjenPerbendaharaan. • Percepatanpenarikan PHLN, pasal 13 jopasal 54 ayat (2), Kewenangan DJA • Penerimaan HLN, pasal 14 • Penguranganalokasi PLN, pasal 17 • Penguranganalokasi HLN, pasal 29

  7. LINGKUP REVISI PADA DITJEN CIPTA KAYA B. RevisiAnggaran Yang DisebabkanPerubahanatauPergeseranAnggarandalam Hal PaguTetap : • Pergeseran dalam keluaran yang sama, kegiatan yang sama dan antar satker dalam wilayah kerja Kantor Wilayah Direktorat Jenderal Perbendaharaan yang berbeda; • Pergeseran antar keluaran, kegiatan yang sama dan antar satker dalam wilayah kerja Kantor Wilayah Direktorat Jenderal Perbendaharaan yang berbeda; • Penggunaan Dana Output Cadangan, pasal 34 • Penghapusan/perubahancatatandalamhalaman IV DIPA, pasal 31

  8. TERIMA KASIH

More Related