TDC2-TCC2 consolidation status report to EATM. 10 .12.2013 In sharepoint : https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/. 2013 planning. Goal end 2013: 6 hot items out of the way. Removal of hot items. Removal of hot items from the worksites:
E N D
TDC2-TCC2 consolidationstatus report to EATM 10.12.2013 In sharepoint: https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/
2013 planning Goal end 2013: 6 hot items out of the way.
Removal of hot items • Removal of hot items from the worksites: • TCSC removed first and brought to B.955 • 3 splitter2 magnets and 2 MDLV removed and stored in TDC2
Removal of hot items 3 splitter2 magnets 2 MDLV magnets
2014 Planning Operation Worksite Op. Worksite