An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE ENGAGE EMPOWER

  2. Agenda • Completed Construction Projects • LAC Building I (Bookstore) • Current Construction Projects • LAC Building A – Student Services Retrofit • LAC Building I (Landscape) • LAC Master Landscape • LAC Veterans Stadium Lights • PCC MDAB (Multi-Disciplinary Academic Building) • PCC Building CC Retrofit • Upcoming Construction Projects • LAC Math Technology Building • PCC Building GG • LAC Building C Retrofit • Q & A

  3. Completed Construction Projects LAC Building I - Measure E 2008 • Building construction complete • Move in complete • Bookstore is open for business

  4. Current Construction Projects LAC Building A – Student Services Retrofit Measure E 2008 • Progress on sheeting the roof • Interior wall framing in progress • Subfloor and utility installation in progress • Estimated completion date late fall 2012

  5. Current Construction Projects LAC Building A – Student Services Retrofit Measure E 2008 • Structural walls complete on new addition • Roof structure to follow

  6. Current Construction Projects LAC Building I Landscape - Measure E 2008 • Exterior Landscape has started • Privacy wall started, planting to follow • Project expected to be complete in May 2012

  7. Current Construction Projects LAC Master Landscape - Measure E 2008 • Phase 1, South of Building A Bid opening date 5/22/2012 • Construction to start in summer 2012 • Passive Storm water retention system • Low water use Plants and trees • Pedestrian pathway alignment

  8. Current Construction Projects LAC Master Landscape - Measure E 2008 • Phase 2, North of Building A will bid Spring 2013 • Construction to start in summer 2013 • Active Storm water retention system • Low water use Plants and trees • Pedestrian pathway alignment

  9. Current Construction Projects Veteran’s Stadium Lighting Measure E 2008 • Stadium lighting retrofit • Awaiting final DSA approval • Construction includes demo of old fixtures and installation of energy efficient fixtures.

  10. Current Construction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2008 • MDAB building remodel project • Phase 1 of 2 currently under construction • Exterior envelope 90% constructed • Roof Membrane 100% complete

  11. Current Construction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2008 • South side exterior curtain wall • Electrical distribution transformer complete • Phase 1 Project to be completed Summer 2012

  12. Upcoming Construction Projects PCC Building CC Retrofit - Measure E 2008 • Building CC Fitness Center, offices and restrooms • Demolition complete, exterior walls in progress • Duration of project approximately 12 months • Anticipated end of construction Fall 2012

  13. Upcoming Construction Projects Math and Culinary Arts instructional program as well as Reprographics Contract awarded to Harper/Sillman Design Build Team Currently in design development phase (DD) Construction documents to DSA Fall of 2012 Anticipated start of construction 2013 LAC Math Technology Building – Measure E 2008

  14. Upcoming Construction Projects PCC Building GG - Measure E 2008 • 16 Design Build Entities (DBE) short listed to 5 • Interviews with 5 short listed DBE teams complete in January • 3 Teams selected for proposals, Balfour Beatty, C.W. Driver, Bernards • Estimated start of construction December 2013

  15. Upcoming Construction Projects LAC Building C Retrofit - Measure E 2008 • Hired Architect to do design work • Program phase is currently ongoing • Work includes modernization of structure, classrooms spaces, and office areas

  16. Liberal Arts Campus Site Plan l i b e r a l a r t s

  17. Pacific Coast Campus Site Plan p a c i f i c c o a s t

  18. QUESTIONS& ANSWERS EDUCATE ENGAGE EMPOWER