An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWR: Site electrical power, includes power install on levels 1, 3L, and 4, and power monitoring LBT Q1 2007 Engineering Review

  2. Highlights (Q1/2007) Instrument room power defined and designed Machine shop being moved to level 3L Power to 3L defined and layout designed Materials purchased Installation begun Power additions to level 4 have been designed to support LUCIFER Power monitoring begun Purchased a Power Quality Analyzer Monitoring PF on incoming switch gear Phase imbalance noted on several 3 phase panels

  3. Open Issues Technical Rebalance 3 phase panels Schedule Scheduled for Q3 or Q4 Financial None Resource Time to implement design

  4. Progress (Q1/2007) Installation of the instrument room just beginning Power to level 3L is underway; panels, transformer, and most conduit is installed Boxes on 3L are being installed as time permits Level 4 power expansion designed

  5. Planning (Q2/2007) Finish power installation on 3L Organize machine shop Order materials for level 4 and start installation Continue monitoring power quality Balance phases