PSPI: PEPSI installation preparation, includes all of the pier modifications. LBT Q1 2007 Engineering Review. Highlights (Q1/2007). Install conduit for FO Install LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridge. Open Issues. Technical Painting floor and walls
E N D
PSPI: PEPSI installation preparation, includes all of the pier modifications LBT Q1 2007 Engineering Review
Highlights (Q1/2007) Install conduit for FO Install LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridge
Open Issues Technical Painting floor and walls Schedule Not yet Financial None Resource Identify paint and paint contractor
Progress (Q1/2007) Fiber optic cable and conduit has been installed LIU is installed
Planning (Q2/2007) Terminate fibers Define and install the connection point box Install some services
Planning (before 2008) Install services install E-net, install E-stop install telephone install cooling water, 47 deg install clean, dry air install power and conduit Move florescence lights up to 4 M Insulate all pipe carrying liquids Move J box up to 4 M Epoxy paint entire floor Paint walls with epoxy paint Install the support brackets on the telescope gallery