LBT Q1 2007 Engineering Review. RSU Rigid Secondary Units. Highlights (Q1/2007). Hexapod #3 Accepted and shipped to OSU. Open Issues. Technical None Schedule Mirror polishing running late LBTO supplied hub Financial None Resource Telescope availability for installation/alignment.
E N D
LBT Q1 2007 Engineering Review RSU Rigid Secondary Units
Highlights (Q1/2007) • Hexapod #3 Accepted and shipped to OSU LBT Q1 2007 Engineering Review
Open Issues • Technical • None • Schedule • Mirror polishing running late • LBTO supplied hub • Financial • None • Resource • Telescope availability for installation/alignment LBT Q1 2007 Engineering Review
Progress (Q1/2007) • Mirror support designed (OSU) • Flexure analysis (OSU) • Mirror support fabrication • Hexapod finished LBT Q1 2007 Engineering Review
Planning (Q2/2007) • Ship mirror to OSU • Install flexures in mirror (OSU) • Begin lab integration (OSU) LBT Q1 2007 Engineering Review