LBT Q1 2007 Engineering Review. CRNS. Highlights (Q1/2007). Upper crane heater modification. Open Issues. Technical Time delay required for heating unknown Schedule None Financial None Resource None. Progress (Q1/2007). Heater control circuit modified Drawings updated and issued.
E N D
Highlights (Q1/2007) • Upper crane heater modification LBT Q1 2007 Engineering Review
Open Issues • Technical • Time delay required for heating unknown • Schedule • None • Financial • None • Resource • None LBT Q1 2007 Engineering Review
Progress (Q1/2007) • Heater control circuit modified • Drawings updated and issued LBT Q1 2007 Engineering Review
Planning (Q2/2007) • No scheduled activities LBT Q1 2007 Engineering Review