An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q1 2007 Engineering Review CRNS

  2. Highlights (Q1/2007) • Upper crane heater modification LBT Q1 2007 Engineering Review

  3. Open Issues • Technical • Time delay required for heating unknown • Schedule • None • Financial • None • Resource • None LBT Q1 2007 Engineering Review

  4. Progress (Q1/2007) • Heater control circuit modified • Drawings updated and issued LBT Q1 2007 Engineering Review

  5. Planning (Q2/2007) • No scheduled activities LBT Q1 2007 Engineering Review