LBT Q2 2007 Engineering Review

LBT Q2 2007 Engineering Review. ENGG – Engineering General. Highlights (Q2/2007). Spending on target Hired Andrew Rakich (June) Hired AJ Brotherton (May) Launched Mirror Cell Documentation Test Camera Design Review Dynamic Balancing Design Review Acceptance test AGw #3

minya
Download Presentation

LBT Q2 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q2 2007 Engineering Review ENGG – Engineering General

  2. Highlights (Q2/2007) • Spending on target • Hired Andrew Rakich (June) • Hired AJ Brotherton (May) • Launched Mirror Cell Documentation • Test Camera Design Review • Dynamic Balancing Design Review • Acceptance test AGw #3 • LINC progress meeting • Lucifer progress meeting • Board meeting Heidelberg • Launched Azimuth Track Protection Meeting • Visit by Pierre Sangasset (ESO) LBT Q2 2007 Engineering Review

  3. Open Issues • Technical • Mirror covers – Temporary and Facility • Telescope alignment plan • Vibration mitigation effort • Schedule • Extremely tight schedule for Gregorian preparation work • Slow progress on telescope commissioning • Financial • Tight but reasonable budget – tight cost control essential • Hardpoint re-build unbudgeted • DYB budget uncertainty • Resource • High pressure and work load on group • Mountain support and resources • Tech support in Tucson LBT Q2 2007 Engineering Review

  4. Progress (Q2/2007) • Andrew Rakich visit √ • LGS meeting May √ • LINC/Lucifer meeting May √ • LBT Board meeting May √ • Mirror cover test May - Cancelled • AGw #3 acceptance test May – Rescheduled for July √ • LBC Red cryostat acceptance testing May/June - Postponed • New student hire: Matthew Stohr √ • Vibration measurement campaign end of June - Postponed • AO progress meetings / follow-up √ • Test Camera progress follow-up √ • Vacation √ LBT Q2 2007 Engineering Review

  5. Planning (Q3/2007) • Visit to ADS, Microgate, Arcetri • Progress meeting Test Camera • Shipping of AGW #3 to Arizona • Acceptance LBC-Red Cryostat • Meeting on LBT future instrumentation (Sept) • Board meeting Rome (Sept) LBT Q2 2007 Engineering Review