PACIFIC PARTNERSHIP 2012

PACIFIC PARTNERSHIP 2012. 12 OCT 11 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 USNS MERCY State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FISC-Yokosuka C7F CTF 76 C3F. DLA Troop Support - Pacific 30 th NCR MCAST. PP 12 Weekly Planning Rhythm.

drago
Download Presentation

PACIFIC PARTNERSHIP 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PACIFIC PARTNERSHIP 2012 12 OCT 11 OPT Brief This brief is classified: UNCLASSIFIED

  2. Roll Call CDS-7 USNS MERCY State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FISC-Yokosuka C7F CTF 76 C3F • DLA Troop Support - Pacific • 30thNCR • MCAST

  3. PP 12 Weekly Planning Rhythm 1000W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs Fri Sat 1300-1500W OPT VTC 1000W COMMS WG 1000W Comm Integration WG 0930W CA WG CPF N33 Update 1300W LOG WG ENG WG TBD 1300W FP WG Every other week

  4. Planning Timeline EXORD PLANORD Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter MOU Letters Signed PN Invitation letters Final Initial Requirements Systems Assessment plan Advanced Echelon PDSS Deployment

  5. ADF Planning Status -PLACE HOLDER No Change

  6. JSDF Planning Status -PLACE HOLDER No Change

  7. NZDF Planning Status • Decision brief has been prepared for COMD Joint Forces New Zealand based on FST deployment to Vietnam 10 – 24 Jul 12.

  8. Force Sourcing Update • 490 of 592 billets are sourced. • 102 were non-concurred by FFC. • In staffing for Joint sourcing. • USA 807th will fill 26 billets. No Change

  9. Medical Update • Medical WG Telcon held on 11 Oct 11 • Provider Credential / Privileging process outlined Pre-Deployment Handbook undergoing revision; should be completed before the PP12 MPC • Force Health Protection information disseminated

  10. Engineering Update Engineering Working Group: Mondays 1500PST • PDSS teams have been assembled, standing by for travel guidance. • 5 PAX total per country • CONOPS being developed to determine FIE/SIE feasibility. • Possible engagement in Exercise Pacific Angel, VNM phase. RFI’s • Can US provide transportation support for an AUS FIE? • What is the Commanders guidance for logistics support ashore? • What ship to shore capability exists to support engineer LOO? • How will PN, HN life support requirements be met? • Who is responsible for non-US PDSS funding? • What is the C4I/Comm plan for VNM phase? • What C4I support can be provided for AUS contingent? • From HN, what are priority SMEE topics for engineers?

  11. Logistics Update • LOG WG held 11 Oct • APRI update - $3.9m requested from PACOM, with advice that $2.5m will be funded. Other PACOM funds being reviewed to fund balance. • Initial allocation of $300K for USNS MERCY likely to be available by end Oct 11 • PDSS update - Proposed list submitted to CDRE for concurrence. Logistics participants identified and include: • DLA Troop Support x 2 (Philippines/Cambodia x 1 only) • FLC x 2 (Singapore / Yokosuka) • Log Lead (SUPPO MERCY rep)

  12. Civil Affairs Working Group 1st Working Group VTC will be 17 October, 2011, at 0930 Hawaii standard time. For assistance please contact: CDR Joyce Blanchard (808) 474-6954 (joyce.blanchard@navy.mil) LCDR Tom Price (808) 474-5455 (thomas.s.price1@navy.mil) No Change

  13. PP12CIS Information Systems Status(12OCT11) 13 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  14. PP12CIS Information Systems Status(12OCT11) 14 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  15. PP12CIS Information Systems Status(12OCT11) 15 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  16. PP12CIS Information Systems Status(12OCT11) 16 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  17. PP12CIS Information Systems Status(12OCT11) 17 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  18. Force Protection Update • PDSS Pre-Travel Requirements • Updated ISOPREPs • APACS • IATP • AOR location specific brief • Level I ATFP • SERE 100 B

  19. Public Affairs Update -PLACE HOLDER