210 likes | 344 Views
PACIFIC PARTNERSHIP 2012. 12 OCT 11 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 USNS MERCY State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FISC-Yokosuka C7F CTF 76 C3F. DLA Troop Support - Pacific 30 th NCR MCAST. PP 12 Weekly Planning Rhythm.
E N D
PACIFIC PARTNERSHIP 2012 12 OCT 11 OPT Brief This brief is classified: UNCLASSIFIED
Roll Call CDS-7 USNS MERCY State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FISC-Yokosuka C7F CTF 76 C3F • DLA Troop Support - Pacific • 30thNCR • MCAST
PP 12 Weekly Planning Rhythm 1000W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs Fri Sat 1300-1500W OPT VTC 1000W COMMS WG 1000W Comm Integration WG 0930W CA WG CPF N33 Update 1300W LOG WG ENG WG TBD 1300W FP WG Every other week
Planning Timeline EXORD PLANORD Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter MOU Letters Signed PN Invitation letters Final Initial Requirements Systems Assessment plan Advanced Echelon PDSS Deployment
ADF Planning Status -PLACE HOLDER No Change
JSDF Planning Status -PLACE HOLDER No Change
NZDF Planning Status • Decision brief has been prepared for COMD Joint Forces New Zealand based on FST deployment to Vietnam 10 – 24 Jul 12.
Force Sourcing Update • 490 of 592 billets are sourced. • 102 were non-concurred by FFC. • In staffing for Joint sourcing. • USA 807th will fill 26 billets. No Change
Medical Update • Medical WG Telcon held on 11 Oct 11 • Provider Credential / Privileging process outlined Pre-Deployment Handbook undergoing revision; should be completed before the PP12 MPC • Force Health Protection information disseminated
Engineering Update Engineering Working Group: Mondays 1500PST • PDSS teams have been assembled, standing by for travel guidance. • 5 PAX total per country • CONOPS being developed to determine FIE/SIE feasibility. • Possible engagement in Exercise Pacific Angel, VNM phase. RFI’s • Can US provide transportation support for an AUS FIE? • What is the Commanders guidance for logistics support ashore? • What ship to shore capability exists to support engineer LOO? • How will PN, HN life support requirements be met? • Who is responsible for non-US PDSS funding? • What is the C4I/Comm plan for VNM phase? • What C4I support can be provided for AUS contingent? • From HN, what are priority SMEE topics for engineers?
Logistics Update • LOG WG held 11 Oct • APRI update - $3.9m requested from PACOM, with advice that $2.5m will be funded. Other PACOM funds being reviewed to fund balance. • Initial allocation of $300K for USNS MERCY likely to be available by end Oct 11 • PDSS update - Proposed list submitted to CDRE for concurrence. Logistics participants identified and include: • DLA Troop Support x 2 (Philippines/Cambodia x 1 only) • FLC x 2 (Singapore / Yokosuka) • Log Lead (SUPPO MERCY rep)
Civil Affairs Working Group 1st Working Group VTC will be 17 October, 2011, at 0930 Hawaii standard time. For assistance please contact: CDR Joyce Blanchard (808) 474-6954 (joyce.blanchard@navy.mil) LCDR Tom Price (808) 474-5455 (thomas.s.price1@navy.mil) No Change
PP12CIS Information Systems Status(12OCT11) 13 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(12OCT11) 14 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(12OCT11) 15 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(12OCT11) 16 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(12OCT11) 17 On-track Off-Track/Recoverable Off-Track not recoverable Completed
Force Protection Update • PDSS Pre-Travel Requirements • Updated ISOPREPs • APACS • IATP • AOR location specific brief • Level I ATFP • SERE 100 B
Public Affairs Update -PLACE HOLDER
Mission Commander • COMMENTS
Closing Questions/Comments State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FISC-Yokosuka C7F CTF 76 C3F • DLA Troop Support - Pacific • 30thNCR • MCAST • USNS MERCY • CDS-7